Laserfiche WebLink
ROLL CALL VOTE: <br />AYES: Commissioners Blank, Narum and Pearce. <br />NOES: Commissioner Fox. <br />ABSTAIN: None. <br />RECUSED: Commissioner Olson. <br />ABSENT: Commissioner O’Connor. <br />Resolution No. PC-2009-09 approving PSDR-388 was entered and adopted as <br />motioned. <br />Commissioner Fox stated that somebody asked her why there were so many banks <br />Downtown. She indicated that she found out in 1973 that the City passed an <br />ordinance requiring banks to open a branch in the Downtown before it could open a <br />branch anywhere in town. She noted that this was the case until the mid-1980’s <br />when the ordinance was revised requiring the presence of eight banks Downtown. <br />Chair Pearce called for a five-minute break at 9:15 p.m., and reconvened the regular <br />meeting at 9:20 p.m. <br />Commissioner Fox left the meeting at this point. <br />Commissioner Olson returned to the dais. <br />c. PUD-84-21-4M, Braddock & Logan <br />Application for a PUD major modification to add 12 new apartment units <br />in three buildings and miscellaneous site modifications at the Civic <br />Square apartments located at 4800 Bernal Avenue. Zoning for the <br />property is PUD-HDR (Planned Unit Development – High Density <br />Residential) District. <br />Mr. Pavan presented the staff report and described the scope, layout, and key <br />elements of the application. He noted that the numbering of the Staff <br />Recommendation on page 12 should read “1.” and “2.” instead of “1.” and “3.” <br />Commissioner Narum disclosed that she met with Mr. Byde at the site. <br />Commissioners Blank and Olson also noted that they visited the project site. <br />Commissioner Blank inquired whether projects like this are required to be wired for <br />photovoltaics. <br />Mr. Pavan replied that the project includes a solar water heater for the pool. He <br />noted that when staff reviewed the project, given the amount of roof area potentially <br />available in a southeasterly to southwesterly orientation, it was determined that the <br />project would most likely not realize a significant return in total kilowatts based upon <br />the cost to install it. He added that should the Commission believe it should be in <br />PLANNING COMMISSION MINUTES, March 25, 2009 Page 23 of 27 <br /> <br />