My WebLink
|
Help
|
About
|
Sign Out
ORD 1869
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1801 - 1900
>
ORD 1869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:07 PM
Creation date
10/25/2002 4:11:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/1/2002
DOCUMENT NO
ORD 1869
DOCUMENT NAME
BUILDING CODES
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Step 1: <br />The property owner shall submit to the City within one year <br />of the adoption of this Chapter a structural engineering <br />report. The purpose of this report is to establish, by <br />required tests, the strength of the mortar material holding <br />the bricks or hollow clay blocks together. Such tests will <br />reveal if the walls have proper attachment to the roof <br />system and, in the case of multi-story buildings, that the <br />floor systems are also properly attached to the wall system. <br />The tests are to be completed by a licensed engineer or <br />architect. A property owner with a building which does not <br />have a proper wall-to-roof or wall-to-floor attachment must <br />complete the attachment within two (2) years of the <br />adoption of this Chapter. <br /> <br />B. Step 2: <br />1. If the property owner desires to reinfome the existing <br />building, the property owner is to submit plans to the City's <br />Building and Safety Division and Planning Departments. <br />The property owner shall complete the repairs based on the <br />classifications (Table A)I within the time frame (Table B) <br />of this Chapter and based on the structural stability of the <br />structural engineering report. To ensure that the work <br />progresses in a timely manner, the property owner shall <br />obtain a building permit at least one year prior to the last <br />day of the time frame established by Table B. <br /> <br />Table A - Rating Classification <br /> <br /> Type Of Building Classification <br /> Hazardous building I <br /> High-risk building II <br /> Medium-risk building III <br /> Low-risk building IV <br /> <br /> Table B - Time Frame Based on Type <br /> <br />Classification Type Time Frame <br />I Hazardous or dangerous Immediately <br />II High-risk 5 Years <br />III Medium-risk 7 Years <br />IV Low-risk 10 Years <br /> <br />130 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.