Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK FOR <br /> I- 580 /FALLON ROAD INTERCHANGE MODIFICATION PROJECT <br /> City of Dublin <br /> TRAFFIC FORECAST UPDATE <br /> This is the scope of work of CCS Planning and Engineering, Inc. to provide traffic engineering services <br /> related to the updating of the traffic portion of the Project Study Report Project Report for the I -580 <br /> Fallon Road Interchange, and to redefine the interchange conceptual geometrics based on the Year 2015 <br /> traffic forecast for the Phase I, initial project. <br /> CCS Planning and Engineering, Inc., in conjunction with TJKM, Dowling Associates, Inc. (Dowling), <br /> and David J. Powers and Associates (Powers) will perform the following items of work: <br /> PSR TRAFFIC ANALYSIS UPDATE <br /> Task 1. Coordination meetings (CCS, TJKM) Attend coordination meetings with City of Dublin, City of <br /> Pleasanton, Alameda County, and Caltrans. <br /> Task 2. Review Traffic Forecasts and Previous Traffic Analysis <br /> Task 2a Compile and review data from previous traffic analysis (TJKM) <br /> Task 2b Prepare updated traffic forecasts (Dowling) Produce AM and PM peak hour turning <br /> movement forecasts for two intersections: I -580 westbound off ramp and Fallon, and I -580 <br /> eastbound off -ramp and Fallon. Plots of AM and PM peak hour link flows will be provided <br /> for the freeway and surface street approaches to the interchange and for the interchange itself. <br /> This data will be delivered to TJKM Associates for their operations analysis. <br /> Task 2c Prepare updated traffic forecasts with Jack London Extension (Dowling) A second set <br /> of model runs will be prepared to include the West Jack London Extension to El Charro <br /> Road. The same AM and PM peak hour plots and turning movement outputs will be <br /> produced and delivered to TJKM Associates. <br /> Task 3. Review and update assumptions (TJKM) Prepare year 2015 traffic forecasts based on Dowling <br /> Associates' year 2000 validation runs, existing counts, and City's traffic growth patterns. Update <br /> assumptions based on the latest available counts (no new counts will be conducted), land -use <br /> information, street network, and other issues such as cut through traffic. <br /> Task 4. Perform and Update Operation Analyses for Years 2015 and 2025 Scenarios (TJKM) <br /> Update the Traffic Operations Analysis for the Fallon Road/I -580 Interchange prepared by TJKM <br /> in 1999. Use the 2000 Highway Capacity Manual or 2001 CORSIM to perform the freeway and <br /> ramp junctions traffic operations; modified Circular 212 method as adopted by Contra Costa <br /> Transportation Authority (CCTA) or method normally used in each City for intersection level of <br /> service analysis; Poisson Ratio method (Caltrans approved) to estimate the queue length for the <br /> turning lanes at ramp -end intersections; and SYNCHRO to evaluate the queue length and levels <br /> 1 11/27/01 <br />