Laserfiche WebLink
of any ultimate geometry improvements that should be incorporated in the Year 2015 project. <br /> The evaluation will include right -of -way, drainage, utility relocation, and traffic impacts etc. for <br /> construction phasing of the "ultimate" project. <br /> Task 4. Update Construction Cost Estimate and Design Schedule (CCS) Construction cost estimate and <br /> design schedule will be updated based on the revised geometrics prepared under Tasks 1 and 3. <br /> Task 5. Prepare Final GAD (CCS) Final GAD will be prepared and submitted to Caltrans upon <br /> receiving comments on the draft GAD. <br /> 3 11/27/01 <br />