My WebLink
|
Help
|
About
|
Sign Out
DUBLIN SAN RAMON SERVICES WASTEWATER DISPOSAL (13-1172C)
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
D
>
DUBLIN SAN RAMON SERVICES WASTEWATER DISPOSAL (13-1172C)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 3:19:08 PM
Creation date
12/2/2009 10:50:25 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
11/3/1992
LONG TERM AGREEMENTS - NAME
DUBLIN SAN RAMON SERVICES DISTRICT
LONG TERM AGREEMENTS - TYPE
WATER SERVICES AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
WASTEWATER DISPOSAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. LAVWMA JPA that certain agreement entitled, "Amended and <br /> Restated Joint Exercise of Powers Agreement for the Livermore <br /> Amador Valley Water Management Agency "LAVWMA entered <br /> into September 10, 1997, by and among the Cities of Livermore <br /> and Pleasanton, and the Dublin San Ramon Services District, as <br /> Member Agencies. <br /> i. LAVWMA's EXPANSION PROJECT the export pumping and <br /> pipeline expansion project for Wastewater disposal that increases <br /> the total design capacity of the LAVWMA system to 41.2 mgd <br /> PWWF, consisting of an expansion component and a repair <br /> component. The expansion component includes a new pipeline <br /> which is intended to have a design capacity of 21 mgd PWWF, an <br /> expanded export pumping station and, at an appropriate time, a <br /> pump station funded by the City of Livermore and possible <br /> improvements to the LAVWMA sole -use interceptor. Construction <br /> of the new pipeline will be followed immediately by the repair <br /> component consisting of the relining or replacement of the existing <br /> pipeline which is intended to have a design capacity of 20.2 mgd <br /> PWWF. <br /> J. mqd Basic Agreement definition. <br /> K. Operational with reference to District's WTP Stage 4 Expansion <br /> Project and LAVWMA's Expansion Project, respectively, that state <br /> of construction which provides and allows for the treatment and <br /> disposal of Wastewater in amounts substantially equivalent to the <br /> Design Capacity of the respective expanded facilities, irrespective <br /> of whether District (in the case of the WTP Stage 4 Expansion <br /> -4- <br /> Agmt-28 <br /> F\sh\sh \DSRSD <br /> DES rg:04/19/99;08/21 /00R <br /> AK v. 2: 10/10/OOR; DES 10/22/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.