Laserfiche WebLink
a. Capacity allocations from 0 -5 MGD have been determined by <br /> previous agreement and are not a subject of this Agreement. <br /> All flows are based upon Average Dry Weather Flow. <br /> b. This represents an increase of approximately one million <br /> gallons in treatment capacity at the District's Plant which <br /> may occur due to lower discharge standards due to partici- <br /> pation in the LAVWMA pipeline project. As this additional <br /> capacity develops, it shall be offered for purchase at the <br /> percentages indicated in Section 7, Additional Capacity. <br /> c. The above percentages recognize the existing distribution of <br /> capacity based upon the 1967 Agreement between the parties, <br /> the 1972 Settlement Agreement, the District's Utility Agree- <br /> ment with the U.S. Army, and the existence of Assessment <br /> District 1960 -1. <br /> For the purposes of the above allocation, all real property pre- <br /> sently within the City that was originally assessed as part of V.C.S.D. <br /> 1960 -1 Assessment District shall be considered as being within District <br /> for allocation of sewage capacity and has been included in the alloca- <br /> tion amount and percentage indicated as belonging to District. Except <br /> for the above, all real property located immediately south of Highway <br /> I -580 shall be deemed to be in City and included within the amount <br /> and percentage of the allocation set forth herein. <br /> SECTION 8. EXPANSION OF PLANT CAPACITY. <br /> District is scheduled to receive State and Federal grants for the <br /> expansion of its plant for the phase -out of City's Plant set forth in <br /> Section 7 of this contract. Said grants, which account for 87 -1/2 of <br /> the cost of such expansion of District's Plant, according to existing <br /> State and Federal grant criteria are available only on a one -time <br /> basis and all future expansion of capacity at District's Plant may <br /> have to be funded totally by District and /or City. District's Plant <br /> was designed initially to expand from time -to -time in appropriate <br /> increments to serve the future needs of the area served by it. In <br /> -10- <br />