Laserfiche WebLink
addition, District's Plant is subject to regulations by the RWQCB. <br /> District is required to develop plans for the Regional Board's review <br /> regarding future expansion when District's Plant reaches 75% of its <br /> capacity prescribed by Regional Board standards (Section 2252, Title <br /> 23, Chapter 3, California Administrative Code). In recognition of <br /> the foregoing facts and to insure fair and equitable consideration of <br /> future capacity needs of the parties, the following shall govern future <br /> capacity requirements. <br /> Within ninety (90) days following District's Plant reaching <br /> seventy -five per cent (75 of its capacity as prescribed in Regional <br /> Board discharge requirements, District and City shall cause a future <br /> sewage treatment needs assessment and study to be prepared and com- <br /> pleted on a timely basis. Such study may be undertaken by District <br /> and City or by a mutually agreed to consultant. The study shall in- <br /> clude, but not be limited to, a consideration of the following: <br /> Projected additional plant capacity to provide sewerage services to <br /> District and /or City based upon the most recent planning projections <br /> made by District and City for their respective jurisdictions; projected <br /> costs for additional capacity; projected sewer connection fees nec- <br /> essary to fund the expansion, as well as provide necessary funds for <br /> additions and improvements to comply with Section 13. Upon completion <br /> of the study, if any expansion is indicated for either District or <br /> City or both, District and City shall first agree upon a reasonable, <br /> viable and logical size of the additional increment of sewage treat- <br /> ment capacity to be added based upon accepted wastewater engineering <br /> practices and then District shall apply to the Regional Board for <br /> permission to proceed to add said capacity to its plant. <br /> -11- <br />