My WebLink
|
Help
|
About
|
Sign Out
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
R
>
RIDGE VIEW COMMONS
>
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:55:16 PM
Creation date
1/13/2010 2:35:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/27/1988
LONG TERM AGREEMENTS - NAME
RIDGE VIEW COMMONS
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - H4964 <br />Addendum C <br />Supplementary General Conditions <br />Willow Glen Apartments <br />(also known as Ridge View Commons) <br />The General Conditions of the Contract for Construction AIA Document A <br />201 (1976 Edition) with respect to the Contract between Eden Housing, Inc., a <br />California non - profit Corporation and Bogard Construction, Inc., regarding <br />Willow Glen Apartments in Pleasanton, California is modified by these <br />Supplementary General Conditions. <br />1. Delete the existing Section 1.3.1 in its entirety and <br />substitute the following language: <br />"1.3.1, All drawings, specifications and copies thereof <br />furnished by the Architect are and shall remain the property of <br />the Owner. They shall not be used on any other project without <br />the prior written consent of the Owner." <br />2. Add a new Section 3.3.2 as follows: <br />"3.3.2 If, after consultation with the Architect, <br />suspension of the Work is warranted by reason of unforeseen <br />conditions which may adversely affect the quality of the Work if <br />such Work were continued, the Owner may suspend the Work by <br />written notice to the Contractor. In such event, the Contract <br />Time shall be adjusted accordingly, and the Contract Sum shall be <br />adjusted to the extent, if any, that additional costs are <br />incurred by reason of such suspension. If the Contractor, in its <br />reasonable judgment, believes that a suspension is warranted by <br />reason of unforeseen circumstances which may adversely affect the <br />20:constr.add 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.