My WebLink
|
Help
|
About
|
Sign Out
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
R
>
RIDGE VIEW COMMONS
>
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:55:16 PM
Creation date
1/13/2010 2:35:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/27/1988
LONG TERM AGREEMENTS - NAME
RIDGE VIEW COMMONS
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 - 54984 <br />quality of the Work if the Work were continued, the Contractor' <br />shall immediately notify the Owner and the Architect of such <br />belief." <br />3. Add the following language at the end of Section 4.9.1: <br />"The superintendent shall be satisfactory to the Owner. <br />Contractor shall not replace the superintendent without the <br />consent of the Owner except with another superintendent <br />satisfactory to the Owner." <br />4. Add a new Section 4.12.10 as follows: <br />"4.12.10 The Contractor shall assemble for the <br />Architect's approval and transmittal to the Owner three (3) <br />complete copies in loose -leaf binders of all operating and <br />maintenance data from all manufacturers whose equipment is <br />installed in the Work. The Contractor shall also prepare a <br />checklist or schedule showing the type of lubricant to be used at <br />each point of application, and the intervals between lubrication <br />for each item of equipment." <br />5. Add a new Section 4.15.3 as follows: <br />"4.15.3 The Contractor shall be responsible for broken <br />glass, and at completion of the Work shall replace such damaged <br />or broken glass. After broken glass has been replaced, the <br />Contractor shall remove all labels, wash, and polish both sides <br />of all glass. <br />"In addition to general broom cleaning, the Contractor shall <br />perform the following final cleaning for all trades at completion <br />of Work: <br />(a) Remove temporary protections; <br />
The URL can be used to link to this page
Your browser does not support the video tag.