My WebLink
|
Help
|
About
|
Sign Out
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
R
>
RIDGE VIEW COMMONS
>
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:55:16 PM
Creation date
1/13/2010 2:35:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/27/1988
LONG TERM AGREEMENTS - NAME
RIDGE VIEW COMMONS
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Delete the existing Section 7.5.1 in its entirety and <br />substitute the following language: <br />"7.5.1 The Contractor, before commencing the Work, shall <br />if required by any lender for the Project or if required by the <br />City of Pleasanton furnish a Performance Bond and a Labor and <br />Material Payment Bond. The Performance Bond shall be in an <br />amount equal to One Hundred Percent (100%) of the full amount of <br />the Contract Sum as security for the faithful performance of the <br />Contract Documents. The Labor and Material Bond shall be in an <br />amount equal to the One Hundred Percent (100 %) of the full amount <br />of the Contract Sum as security for the payment of all persons <br />performing labor and furnishing materials in connection with the <br />Contract Documents. Such bonds shall be on forms approved by <br />Owner, and shall be issued by a surety satisfactory to the Owner <br />and shall name the Owner as a primary co- obligee." <br />13. Delete the existing Section 7.8.1 in its entirety and <br />substitute the following language: <br />"7.8.1 Payments due and unpaid under this Contract shall <br />bear interest from the date that final determination is made that <br />such payment is due at twelve percent (12%) per annum." <br />14. Delete the existing Section 7.9.1 in its entirety and <br />substitute the following language: <br />"7.9.1 All claims, disputes and other matters between the <br />Contractor and the Owner shall be decided by arbitration in <br />accordance with the Construction Industry Arbitration Rules of <br />the American Arbitration Association then obtaining. Any award <br />rendered by the Arbitrator shall be specifically enforceable <br />4984 <br />
The URL can be used to link to this page
Your browser does not support the video tag.