My WebLink
|
Help
|
About
|
Sign Out
URBAN HABITAT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
U
>
URBAN HABITAT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 12:10:12 PM
Creation date
9/21/2010 12:07:29 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
8/17/2010
LONG TERM AGREEMENTS - NAME
URBAN HABITAT
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P P <br /> PROJECT EXPERIENCE F E H R & PEERS <br /> TRANSPORTATION CONSULTANTS <br /> Mixed Use Trip Generation Research <br /> Mark was part of a team that researched the effects of "D" variables such as development scale and mix, <br /> distance to transit, density, diversity of land use, and demographics on the percentage of trips captured <br /> internally by mixed use developments. Mark was responsible for testing the developed model on several <br /> mixed use sites for the purposes of model validation. The research has been submitted to ITE for review, <br /> and was presented at the Transportation Research Board (TRB) conference in 2009. <br /> Union City Infrastructure Needs Assessment <br /> Mark managed this project that provided a feasibility study for redeveloping an underutilized industrial <br /> area in Union City, CA. The project included traffic operations analysis and travel demand forecasting <br /> within the area. <br /> BART Demand Management Study <br /> As manager of this project, Mark helped forecast ridership levels by station within different time periods <br /> throughout the day, to assist BART with its long term capacity planning. The project included extensive <br /> data collection and statistical analysis of factors that influence transit ridership. <br /> Mendocino Countywide Traffic Model Development <br /> Fehr & Peers developed a countywide traffic model to assist Mendocino County with its capital <br /> improvement plan and to help evaluate development proposals. As manager of this project, Mark <br /> coordinated both internal and external team members to bring the pieces of the project together, as well <br /> as providing his travel demand modeling expertise to assist internal staff in the technical aspects of the <br /> project. <br /> Solano Transportation Authority Fee Study <br /> As primary project engineer, Mark was responsible for all travel demand modeling aspects of this project, <br /> operating a complex Cube / TP+ model to forecast roadway volumes and traffic distributions for the <br /> purposes of determining the specifications of a proposed fee program in Solano County. <br /> Santa Monica General Plan Land Use and Circulation Element <br /> Fehr & Peers developed a comprehensive travel demand model for the City of Santa Monica, CA, including <br /> features to capture the effects of smart growth, transit, walking & bicycling, and parking. Mark managed the <br /> transit piece, using direct ridership modeling to estimate the use of the proposed light rail extension to Santa <br /> Monica and its effect on roadway traffic. <br /> SR4 West PA/ED <br /> Mark developed future year forecasts using the internally - developed City of Stockton Travel Demand Model in <br /> the Cube / TP+ platform, to measure the impacts, both beneficial and harmful, of the extension of the highway <br /> section of SR4 in Stockton, CA beyond its current terminus at 1 -5. <br /> Phillips Lane PSR <br /> Mark was the primary engineer on this project responsible for travel demand forecasting and both static and <br /> dynamic intersection operations analysis of the existing Hillcrest Avenue and the proposed Phillips Lane <br /> interchanges in Antioch, CA. The analysis included the use of project - specific versions of the CCTA Travel <br /> Demand Model for forecasts, and the use of Synchro and SimTraffic for operations analysis. <br /> James Donlon Avenue Extension EIR <br /> This project involved the analysis of intersections in Pittsburg, CA and Concord, CA likely to be impacted by <br /> the construction of a bypass in Pittsburg. Mark was the primary traffic engineer, responsible for both travel <br /> demand forecasting, using the CCTA TransCAD travel demand model, and intersection operations analysis, <br /> using Synchro and CCTALOS software. Mark also wrote the transportation chapter for the EIR. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.