My WebLink
|
Help
|
About
|
Sign Out
URBAN HABITAT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
U
>
URBAN HABITAT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 12:10:12 PM
Creation date
9/21/2010 12:07:29 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
8/17/2010
LONG TERM AGREEMENTS - NAME
URBAN HABITAT
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Work Program <br /> • <br /> reduction and climate change adaptation, including both community- <br /> wide actions and municipal government actions; <br /> • Full descriptions of draft measures, organized by conceptual strategy, to <br /> include estimated costs and benefits, strategies for implementation, and <br /> funding sources. Measures will be ranked as high, medium, and low <br /> priority based on cost and effectiveness; <br /> • ESA will deliver one (I) electronic version of the CAP Development <br /> Memo and associated full descriptions of draft measures in Word, Excel, <br /> or other manipulative format, and one electronic version in a PDF format. <br /> Task 4: Guidance for CEQA Documentation <br /> (Environmental Review) <br /> Upon completion of the Draft CAP, ESA will prepare a technical <br /> memorandum that provides a preliminary analysis of the likely level of <br /> environmental review necessary for CEQA compliance. Based on previous <br /> experience and our review of CEQA documentation for other CAPs, it is <br /> likely that a Mitigated Negative Declaration can be prepared for the <br /> Pleasanton CAP. <br /> As part of this task, we will complete an Initial Study checklist for the Draft <br /> CAP. The checklist will be delivered along with the technical memo. <br /> Through the checklist, we will likely be able to eliminate most issue areas <br /> from further consideration, as there will be no potential for a significant <br /> impact. We will, however, focus on issue areas where there appears to be <br /> some potential for a significant impact, such as Land Use and Planning, and <br /> Traffic. For these topic areas, we will provide detailed discussion of the <br /> potential for specific programs and strategies identified in the Draft CAP to <br /> cause a significant impact. We will provide guidance on how these may be <br /> limited or altered to reduce impacts, and will also provide conclusions <br /> regarding the likelihood of a need for an EIR. Should we conclude that an <br /> EIR is likely to be necessary, we will provide our opinion on what portions <br /> of the CAP should be analyzed at a project level, vs. a programmatic level. <br /> The Initial Study will also be useful in focusing the EIR, if one is necessary. <br /> Task 4 Deliverables: <br /> • Draft and final versions of the technical memorandum. <br /> Task 5: Community Engagement <br /> Town -Green and ESA will develop and launch a community education and <br /> stakeholder engagement program to assist the City and community in <br /> developing a set of goals and objectives for the CAP. We assume that City <br /> staff will be the principal body overseeing development of the CAP, and that <br /> 2 -20 City of Pleasanton Climate Action Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.