My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
120710
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2010 11:07:57 AM
Creation date
12/1/2010 1:00:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/7/2010
DESTRUCT DATE
15Y
DOCUMENT NO
18 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L' t e <br /> STANLEY BLVD / DONATO BUILDERS , 2 E m = a <br /> e= o C a m <br /> d 4 Q m g re 3 <br /> a. Low -VOC Interior Wall /Ceiling Paints <br /> Yes ( <50 Grams Per Liter (gpl) VOCs Regardless of Sheen) 1 <br /> rThis credit is a reauirement associated with J4: EPA IAP1 l <br /> TBD b. Zero-VOC: Interior WaII /Ceiling Paints (<5 gpl VOCs Regardless of Sheen) 1. __Q . _i, <br /> TBD 3. Use Low -VOC Coatings that Meet SCAQMD Rule 1113 0 <br /> ['This credit is a requirement associated with J4: EPA IAPI ;. <br /> .� 4. Use Low -VOC Caulks, Construction Adhesives and Sealants that 0 <br /> Meet SCAQMD Rule 1168 <br /> TBD 5. Use Recycled- Content Paint 0 <br /> 6. Use Environmentally Preferable Materials for Interior Finish <br /> A) ESC- Certified Wood, B) Reclaimed, C) Rapidly Renewable, D) Recycled- Content or <br /> El Finaer- Jointed Fl Local - - <br /> TBD a. Cabinets (50% Minimum) 0 <br /> TBD b. Interior Trim (50% Minimum) 0 ', <br /> TBD c. Shelving (50% Minimum) 0 <br /> TBD d. Doors (50% Minimum) 0 <br /> TBD e. Countertops (50% Minimum) 0 <br /> 7. Required: Reduce Formaldehyde in Interior Finish — Meet Current <br /> Yea CARB Airborne Toxic Control Measure (ATCM) for Composite Wood y R <br /> Fomialdehyde Limits by Mandatory Compliance Dates <br /> rThis credit is a requirement associated with J4: EPA IAP1 ..> <br /> 8. Reduce Formaldehyde in Interior Finish - Exceed Current CARB <br /> ATCM for Composite Wood Formaldehyde Limits Prior to Mandatory <br /> Compliance Dates <br /> TBD a. Doors (90% Minimum) 0 <br /> TBD b. Cabinets & Countertops (90% Minimum) 0 <br /> TBD c. Interior Trim and Shelving (90% Minimum) 0 <br /> TBD 9. After Installation of Finishes, Test of Indoor Air Shows Fomialdehyde 0 <br /> Level <27ppb_ <br /> Total Available Points in Finishes = 27j 1 <br /> F <br /> L. FLOORING <br /> Possible Points <br /> I <br /> 1. Use Environmentally Preferable Flooring ( Minimum 15% Floor Area) <br /> TBD A) FSC- Certified Wood, B) Reclaimed or Refinished, C) Rapidly Renewable, 0 <br /> D) Recycled- Content, E) Exposed Concrete, F) Local. Flooring Adhesives Must <br /> _ MeeLSCAQMD Pose_ 1 Miter VOGs. <br /> TBD 2. Thermal Mass Floors (Minimum 50 %) 0. <br /> TBD 3. Low Emitting Flooring (Section 01350, CRI Green Label Plus, 0 <br /> Floorscore credit is a requirement associated with J4: EPA IAP1 <br /> Total Available Points In Flooring= 81 0 <br /> M. APPLIANCES AND LIGHTING __ Possible Points <br /> Yes I 1. Install ENERGY STAR Dishwasher (Must Meet Current Specifications) 2 . <br /> 2. Install ENERGY STAR Clothes Washer - <br /> a. Meets ENERGY STAR and CEE Tier 2 Requirements 0 <br /> TBD (Modified Energy Factor 2.0, Water Factor 6.0 or less) <br /> TBD b. Meets ENERGY STAR and CEE Tier 3 Requirements 0 <br /> (Modified Energy Factor 2.2, Water Factor 4.5 or less) <br /> 3. Install ENERGY STAR Refrigerator <br /> TBD a. ENERGY STAR Qualified & < 25 Cubic Feet Capacity 0 <br /> TBD ( b. ENERGY STAR Qualified & < 20 Cubic Feet Capacity Q . <br /> 4. Install Built -In Recycling Center or Composting Center _! <br /> TBD a. Built -In Recycling Center 0 <br /> TBD b. Built -In Composting Center 0 <br /> 5. Install High - Efficacy Lighting and Design Lighting System ,. - <br /> TBD I a. Install High - Efficacy Lighting 0 <br /> TBD l b. Install a Lighting System to IESNA Footcandle Standards or Hire Lighting Consultant 0_ F <br /> Total Available Points in Appliances and Lighting = 13j 2 <br /> N. OTHER , Possible Points <br /> Yes 1 . Required: Incorporate GreenPoint Rated Checklist in Blueprints y R <br /> ('This credit is a requirement associated with J4: EPA IAP1 <br /> TBD 2. Pre- Construction Kick -Off Meeting with Rater and Subs i 0 <br /> TBD 3. Homebuildees Management Staff are Certified Green Building 0 <br /> Professionals <br /> Single Family Checklist <br /> © Build It Green New Home Version 4.0 Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.