My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
120710
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2010 11:07:57 AM
Creation date
12/1/2010 1:00:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/7/2010
DESTRUCT DATE
15Y
DOCUMENT NO
18 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L` t ro <br /> STANLEY BLVD / DONATO BUILDERS E d a 2 LI <br /> a < 0 w` a r e <br /> Yes 4. Develop Homeowner Manual of Green Features/Benefits and Conduct 3 <br /> Walkthroughs ('This credit is a requirement associated with J4: EPA 'An _ 1 _ <br /> TBD 5. Install a Home System Monitor OR Participate in a Time-of-Use 0 <br /> Pricing Program _ _ - l <br /> Total Available Points in Other = 6f 3 <br /> O. COMMUNITY DESIGN & PLANNING 1 Possible Points <br /> 1. Develop Infill Sites -- -- -- <br /> Yes a. Project is an Urban Infill Development 2 <br /> Yes b. Homelsl/Developmentis Located within 1/2 Mile of a Major Transit Stop 2 —_a <br /> -- - -- -. t ..4 <br /> TBD 2. Build on Designated Brownfield Site 0 <br /> 3. Cluster Homes & Keep Size in Check .. -. <br /> TBD a. Cluster Homes for Land Preservation 0 <br /> Yes b. Conserve Resources by Increasing Density (10 Units per Acre or Greater) 4 • <br /> c. Home Size Efficiency 2 - - <br /> 1732 I i Enter Average Unit Square Footage <br /> 2.7 n. Enter Average Number of Bedrooms/Unit 1 - <br /> 4. Design for Walking & Bicycling <br /> a. Site Has Pedestrian Access Within 1/2 Mile of Community Services: <br /> TIER 1: Enter Number of Services Within 1/2 Mile <br /> 0 1) Day Care 2) Community Center 3) Public Park 4) Drug Store <br /> 5) Restaurant 6) School 7) Library 8) Farmers Market 9) After School <br /> Programs 101 Convenience Store Where Meat & Produce are Sold ;.. _! ... <br /> TIER 2: Enter Number of Services Within 1/2 Mile <br /> 1) Bank 2) Place of Worship 3) Laundry/Cleaners 4) Hardware '.. <br /> 0 5) Theater/Entertainment 6) Fitness/Gym 7) Post Office I, <br /> 8) Senior Care Facility 9) Medical/Dental 10) Hair Care <br /> 111 Commercial Office or Maior Employer 121 Full Scale Supermarket <br /> i. 5 Services Listed Above (Tier 2 Services Count as 1/2 Service Value) 0 <br /> ii. 10 Services Listed Above (Tier 2 Services Count as 1/2 Service Value) 0 <br /> TBD b Development is Connected with A Dedicated Pedestrian Pathway to Places of 0 <br /> Recreational Interest Within 1/4 mile <br /> c. Install Traffic Calming Strategies (Minimum of Two): <br /> - Designated Bicycle Lanes are Present on Roadways; <br /> TBD - Ten -Foot Vehicle Travel Lanes; I 0 I !, <br /> - Street Crossings Closest to Site are Located Less Than 300 Feet Apart; <br /> - _Streets. Have RumbleStrios. Bulbouts. Raised Crosswalks or Refuae Islands. . <br /> 5. Design for Safety & Social Gathering _t - <br /> TBD a. All Home Front Entrances Have Views from the Inside to Outside Callers 0 <br /> TBD b. All Home Front Entrances Can be Seen from the Street and /or from Other Front 0 <br /> Doors <br /> TBD c. Orient Porches (min. 100sf) to Streets and Public Spaces 0 <br /> TBD d. Development Includes a Social Gathering Space 0 <br /> 6. Design for Diverse Households (6a. is a Prerequisite for 6b. and 6c.) <br /> TBD a. All Homes Have At Least One Zero-Step Entrance 0 <br /> TBD b. All Main Floor Interior Doors & Passageways Have a Minimum 32 -Inch Clear 0 <br /> Passage Space <br /> Yes c. Locate Half -Bath on the Ground Floor 0 <br /> TBD d. Provide Full - Function Independent Rental Unit _ } 0 <br /> Total Achievable Points in Community Design & Planning = 35F 10 <br /> P. INNOVATION Possible Points <br /> A. Site _. , - -- { <br /> 1. Stormwater Control: Prescriptive Path (Maximum of 3 Points, Mutually Exclusive with , <br /> PA2.) ! <br /> TBD a. Use Permeable Paving for 25% of Driveways, Patios and Walkways 0 <br /> TBD b. Install Bio-Retention and Filtration Features 0 <br /> TBD c. Route Downspout Through Permeable Landscape 0 <br /> TBD d. Use Non - Leaching Roofing Materials 0 <br /> TBD e. Include Smart Street/Driveway Design _0 ._j. <br /> TBD 2. Stormwater Control: Performance Path (Mutually Exclusive with PA1): Perform Soil 0 <br /> Percolation Test and Capture and Treat 85% of Total Annual Runoff ... _.; - <br /> C. Landscape <br /> TBD 11. Meet Local Landscape Program Requirement 0 . <br /> D. Structural Frame & Building Envelope <br /> Single Family Checklist <br /> © Build It Green New Home Version 4.0 Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.