My WebLink
|
Help
|
About
|
Sign Out
PC 2002-31
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2002
>
PC 2002-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:47:19 PM
Creation date
4/16/2003 7:34:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/14/2002
DOCUMENT NO
PC 2002-31
DOCUMENT NAME
VINEYARD AVINUE CORRIDOR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phase I improvements, as described below, will exceed their respective ultimate <br />pro rata shazes of the cost of such improvements, making them eligible for <br />reimbursement. Reimbursement depends on the ultimate development of the <br />pazcels within the Corridor, including the Property. <br />I. The Specific Plan specifies the policies associated with the dedication and/or <br />acquisition of the rights-of--way for the realigned Vineyazd Avenue and school <br />loop road. It was contemplated that dedication would occur as projects develop, <br />and any acquisition would occur as necessary to incorporate the required <br />infrastructure. That portion of the Vineyazd Avenue right-of--way and the school <br />loop road are to be dedicated in conjunction with development of the Project. <br />J. In order to construct the roadway improvements contemplated by the City and the <br />District in a financially feasible way, the right-of--way must be dedicated at no <br />cost at this time, with eventual payment, if contemplated in the Specific Plan, <br />taking place as development occurs, as originally contemplated. <br />K. PG&E has planned a 230KV transmission line in the Vineyard Corridor and has <br />received approval from the State of California Public Utilities Commission to <br />construct this line in the new right-of--way of Vineyazd Avenue, if available by <br />July 1, 2002, or, if not, within the existing right-of--way. The City, the District, <br />and property owners prefer this line to be constructed in the realigned Vineyard <br />Revision #2, Draft Lin Development Agreement Page 4 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.