Laserfiche WebLink
Hacienda TOD Standards and Design Guidelines Initial Study <br /> c) Result in a change in air traffic patterns, including either an X <br /> increase in traffic levels or a change in location that results in <br /> substantial safety risks? <br /> d) Substantially increase hazards due to a design feature (e.g., X <br /> sharp curves or dangerous intersections) or incompatible uses <br /> (e.g., farm equipment)? <br /> e) Result in inadequate emergency access? X <br /> t) Result in inadequate parking capacii v? X <br /> g) Conflict with adopted policies, plans, or programs supporting X <br /> alternative transportation (e.g., bus turnouts, bicycle racks)? <br /> Environmental Setting <br /> The information in this section is based on the attached Hacienda Transit Oriented Development <br /> Traffic Analysis, dated January 25, 2011. <br /> 1580, an eight -lane interstate freeway, is the northern boundary, Tassajara Creek to the Iron Horse Trail <br /> right -of -way to Arroyo Mocho is the eastern boundary, Arroyo Mocho is the southern boundary, and <br /> Hopyard Road is the western boundary of Hacienda. (See Figure 1, above.) The three sites are <br /> surrounded by Owens Drive (a four -lane road), Hacienda Drive (a four -lane road), Stoneridge Drive (a <br /> four -lane road) and Willow Road (a four -lane road). Gibraltar Drive (a two -lane road), is the boundary <br /> between the BRE site (Hacienda Site 7E) and the Roche Molecular Systems site (Hacienda Site 6). <br /> The Pleasanton /Dubin BART station is less than '/z mile due north of the three project sites. <br /> Significance Criteria <br /> The impact questions above corstitute the significance criteria for this environmental topic. In addition, <br /> the project would result in a sigrificant effect if it would: <br /> • Result in a substantial increase in traffic that would cause the corridor or intersection level of <br /> service to drop during the peak hour below acceptable level of service (LOS) D, or contributes <br /> traffic to intersections where the levels of service are already below D. <br /> Discussion of Checklist Items <br /> Less - than - Significant Impact with Mitigation. The Project Development replaces land uses on the <br /> project sites from office and light - industrial land -uses to residential and neighborhood- serving retail land <br /> uses. The project density at 55 apartment units to the acre is a moderate density residential development <br /> that produces fewer total trips than the previously approved Office Development. <br /> This lower trip generation rat: is further reduced due to the project development's inclusion of <br /> residential retail development teat facilitates a Transit Oriented Design. The inclusion of retail and <br /> proximity to local and regional transit encourage alternate travel modes that further reduces the trip <br /> generation. <br /> A traffic study was completed for the proposed project on January 21, 2011 and the analysis showed <br /> that eight intersections operated below the level of service D standard, but could be mitigated to LOS D <br /> or better. The traffic study found that the identified improvements would be required with or without <br /> the project construction and improvements are already included in either the General Plan or the Traffic <br /> Development Fee Program. While the project's vehicle trips add to the traffic volume on the roadways, <br /> Draft, Subject to Revision 30 2/11/201i <br />