Laserfiche WebLink
Commissioner Blank noted that whenever there is a Fair, Bernal Corners pulls signs out <br />which allow one-hour parking maximum for customers, after which cars would be towed. <br />He indicated that this appears to work. <br />Commissioner Pentin noted that Condition No. 42 of Exhibit A on Transportation <br />Systems Management (TSM) refers to the project applicant or developer or property <br />owner. He inquired if this was common boilerplate wording or because the City does <br />not identify the person responsible and if it would leave a loophole. <br />Mr. Pavan replied that it is standard boilerplate language and covers all options. <br />Commissioner Blank inquired who the producer of the video simulations was. <br />Mr. Pavan replied that the video simulations were prepared by the applicant. <br />Commissioner Pentin referred to Condition No. 59 which states that the existing 18-inch <br />storm drains stubbed to the property and Bernal Avenue shall be abandoned per City <br />standard requirements. He stated that he understands the storm water and grading will <br />take it to the ponds, but he inquired if the storm drains would simply be abandoned but <br />would still be there and would be able to be brought back into operation if there were <br />ever any issues or problems with water in the area. <br />Mr. Pavan referred the question to Wes Jost, Development Services Manager. <br />Mr. Jost stated that the storm drain is basically stubbed for future use. He indicated, <br />however, that whatever is proposed for the site must be treated, and, therefore, the <br />abandoned storm drains would more than likely not be used in the future. <br />Commissioner Pentin referred to Condition No. 73 which states that minor changes to <br />the plan can be allowed subject to the approval of the Director of Community <br />Development and asked for a definition of “minor.” <br />Mr. Pavan stated that staff has attempted in the past to define “minor” and had no <br />success, and that “minor” is determined on a case-by-case basis. He explained that a <br />proposed modification is judged against the conditions and approved plans, and then a <br />determination is made as to whether the change is minor or major and requires more <br />scrutiny and potentially a hearing before the Planning Commission. <br />Commissioner Pentin inquired if the sign program, size of windows, or illumination <br />would be considered major or minor. <br />Mr. Pavan stated that it would likely require a modification to the PUD. He noted that <br />changing the trim or window colors would be considered minor. <br />PLANNING COMMISSION MINUTES, August 25, 2010 Page 27 of 38 <br /> <br />