Laserfiche WebLink
that they make use of everything they can and noted that they are trying to convert <br />grease to bio fuel for their trucks. He stated that they are one of the original members <br />of the U.S. Green Building Council since 2004 and that they build their current prototype <br />to a Silver LEED rating. <br />Mr. Reuter stated that Safeway is a community partner based in Pleasanton and has <br />over 3,600 employees at their headquarters. He indicated that their new shopping <br />center employs about 350 full and part time employees and that the project proposed is <br />about a $40 million project. He added that they donate to a variety of about <br />75 community organizations. <br />Commissioner Blank stated that in the summary that Mr. Pavan provided, the <br />Commission spent a lot of time discussing what the freeway off-ramp would look like. <br />He indicated that he was a little surprised with the 5 year view. He stated that the sense <br />of the Commission was that when people came off of the freeway, the Commission did <br />not want it to look like a truck stop. He added that he was surprised about the <br />vegetation in the video rendering, which was almost non-existent, and he felt there were <br />huge gaps in it. He said when making the turn off of the freeway, the site is astonishing <br />beautiful in the renderings, but the ride down the freeway off-ramp does not look very <br />good and he wondered if additional landscaping was needed. <br />Mr. Rodrigues stated that the video is not as current as the simulation. He indicated that <br />it was shot last week and that Safeway could not be seen when riding down the <br />off-ramp. <br />Commissioner Blank stated that assuming CalTrans comes in five years from now and <br />wants to widen the freeway and removes the landscaping, Safeway will be visible. <br />Mr. Rodrigues explained that there is also groundcover, shrubbery, and tree growth, in <br />addition to an entire layer of trees which his rendering shows from the back of the <br />Safeway and does not include any of the CalTrans cover. <br />Commissioner Blank stated that the Commission wants to have it massed assuming <br />there is no CalTrans cover because CalTrans could remove that. <br />Mr. Rodrigues stated that there will be shrubbery growing high as shown in the <br />landscape plan. <br />Commissioner Blank stated that he think it needs more filling in. <br />Mr. Rodrigues reiterated that the rendering does not include the CalTrans overlay. He <br />stated that CalTrans could eliminate all of the landscaping within five to ten years, and <br />there would be trees or shrubbery that Safeway would have maintained it so it does not <br />go into the right-of-way. <br />PLANNING COMMISSION MINUTES, August 25, 2010 Page 33 of 38 <br /> <br />