My WebLink
|
Help
|
About
|
Sign Out
ORD 2007
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
5/27/2011 1:04:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/21/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2007
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
connection; a copy of this notification shall be provided to the <br /> Engineering Division. <br /> i. All paved outdoor storage areas shall be designed to minimize <br /> pollutant runoff. Bulk materials stored outdoors that may contribute to <br /> the pollution of stormwater runoff must be covered as deemed <br /> appropriate by the City Engineer/Chief Building Official. <br /> j. Prior to grading permit issuance the project developer shall submit a <br /> copy of the State Water Resources Control Board Notice of Intent <br /> (NOI) for coverage under the State Construction Stormwater General <br /> Permit for projects with clearing, grading and excavation exceeding the <br /> current standards. <br /> k. All metal roofs shall be finished to inhibit rust. <br /> I. Roof drains shall discharge and drain away from the building <br /> foundation to an unpaved area wherever practicable. <br /> 10. Stormwater Construction Requirements. The project development shall <br /> submit a Stormwater Pollution Prevention Plan (SWPPP) for review and <br /> approval by the City Engineer prior to issuance of building or grading <br /> permits. Failure to comply with the approved construction SWPPP may <br /> result in the issuance of correction notices, citations or stop work order. The <br /> following construction Best Management Practices (BMPs), as well as any <br /> other applicable measure, shall be included in the SWPPP and <br /> implemented as approved by the City. <br /> The project developer is responsible for implementing the following <br /> measures during all construction phases of the project: <br /> a. The project developer shall include erosion control/stormwater quality <br /> measures on the final grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the storm drain <br /> system. Such measures may include, but are not limited to, <br /> hydroseeding, hay bales, sandbags, and siltation fences and are <br /> subject to the review and approval of the City Engineer/Chief Building <br /> Official. If no grading plan is required, necessary erosion <br /> control/stormwater quality measures shall be shown on the site plan <br /> submitted for an on-site permit, subject to the review and approval of <br /> the Building and Safety Division. The project developer is responsible <br /> for ensuring that the contractor is aware of and implements such <br /> measures. <br /> b. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading, but in no case later than October 15. <br /> Hydroseeding shall be accomplished before September 15 and <br /> Conditions of Approval/PUD-68 <br /> Appendix Conditions 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.