My WebLink
|
Help
|
About
|
Sign Out
ORD 2007
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
5/27/2011 1:04:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/21/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2007
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
irrigated with a temporary irrigation system to ensure that the grasses <br /> are established before October 15. No grading shall occur between <br /> October 15 and April 15 unless approved erosion control/stormwater <br /> quality measures are in place, subject to the approval of City <br /> Engineer/Chief Building Official. Such measures shall be maintained <br /> until such time as permanent landscaping is place. <br /> c. Gather all construction debris on a regular basis and place it in a <br /> dumpster or other container which is emptied or removed on a weekly <br /> basis. When appropriate, use tarps on the ground to collect fallen <br /> debris or splatters that could contribute to stormwater runoff pollution. <br /> d. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br /> street pavement and storm drains adjoining the site. Limit construction <br /> access routes onto the site and place gravel on them. Do not drive <br /> vehicles and equipment off paved or graveled areas during wet <br /> weather. Broom sweep the street pavement adjoining the project site <br /> on a daily basis. Scrape caked on mud and dirt from these areas <br /> before sweeping. <br /> e. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to <br /> retain any debris or dirt flowing in the storm drain system. Maintain <br /> and/or replace filter materials to ensure effectiveness and to prevent <br /> street flooding. <br /> f. Create a contained and covered area on the site for the storage of <br /> bags, cement, paints, oils, fertilizers, pesticides, or other materials <br /> used on the site that have the potential of being discharged into the <br /> storm drain system through being windblown or in the event of a <br /> material spill. <br /> g. Never clean machinery, equipment, tools, brushes, or rinse containers <br /> into a street, gutter, or storm drain. <br /> h. Ensure that concrete/gunite supply trucks or concrete/plaster <br /> operations do not discharge wash water into street, gutters, or storm <br /> drains. <br /> 11. Stormwater Operation Requirements. All projects, unless otherwise <br /> determined by the City Engineer or Chief Building Official, shall enter into a <br /> recorded Stormwater Treatment Measures Inspection and Maintenance <br /> Agreement for ongoing maintenance and reporting of required stormwater <br /> measures. These measures may include, but are not limited to: <br /> a. A mechanism shall be created, such as a property owners' association, <br /> to be responsible for maintaining all private streets, private utilities and <br /> Conditions of Approval/PUD-68 <br /> Appendix Conditions 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.