Laserfiche WebLink
with a design concrete. The driveways would be parking stalls, so workmen and vans coming to <br /> work on specific homes would be able to park in the driveway. <br /> Commissioner O'Connor asked whether there would be weight limitations for either the private <br /> drive or the driveway. Mr. Paulza replied that the live loads accommodate a fire apparatus so <br /> they would be able to accommodate most vehicles. <br /> Commissioner O'Connor inquired whether the developers would be amenable to condition the <br /> project in the Homeowners Association (HOA) documents to prohibit storage within the garage. <br /> Mr. Paulza replied that they would look into that. <br /> Chair Blank requested that the applicant display where the•parking on Stanley Boulevard would <br /> be. Mr. Paulza pointed out the four spaces on the overhead screen. Chair Blank requested <br /> verification that there would be two spaces within the garage and that the driveway would be <br /> wide enough to accommodate two additional vehicles. Mr. Paulza confirmed that was correct. <br /> Chair Blank inquired whether they would be completely off the private road. Mr. Paulza replied <br /> that was correct. He noted that the aprons were currently 20 feet deep to accommodate a car. He <br /> added that they may become 18 feet deep in order to accommodate a better rear setback, which <br /> would still accommodate a parked car. <br /> In response to Chair Blank's request, the applicant displayed a slide showing Units 3 and 4 and <br /> pointed out the main entry to the units. Chair Blank inquired whether the area between Units 3 <br /> and 4 would be a joint use area for both units. Mr. DiDonato replied that it was for Unit 3, with <br /> a use easement and a solid wall; Unit 4 would get the space on the other side. Mr. Paulza noted <br /> that it would maximize the private open space for each unit by utilizing five additional feet. <br /> Commissioner O'Connor inquired whether the parking spaces that would be created on Stanley <br /> Boulevard existed today. Mr. Paulza replied that there was currently a home there with parking <br /> curb cuts. He added that they proposed having one entry with room for potentially two cars on <br /> each side of that entry. Mr. DiDonato noted that the City has engineered street improvements <br /> that allow for a travel lane, a bicycle lane, and eight feet of on-street parallel parking. <br /> Chair Blank inquired whether this would be classified as affordable housing. Mr. Paulza replied <br /> that he did not believe it would be. Chair Blank inquired about the approximate selling price of <br /> the homes. Mr. DiDonato noted that the project would take about a year to 18 months to entitle <br /> and that there would be a lot of economic concerns for the project. He estimated that the home <br /> prices may be in the $750,000-800,000 range. <br /> THE PUBLIC HEARING WAS OPENED. <br /> Barbara Adams noted that she was impressed by what was being proposed for the new <br /> homeowners: one-quarter acre of open space, appropriate outdoor living space, open space for <br /> units not less than ten feet in every direction. She noted that she lived in a townhome that <br /> bordered this property. She submitted a petition with 65 signatures obtained in a short period of <br /> time and read the language into the record: <br /> EXCERPTS: PLANNING COMMISSION MINUTES, May 21, 2008 Page 6 of 17 <br />