Laserfiche WebLink
. . <br /> • <br /> Z-98-21 I <br /> Page 2 November 5. I'At <br /> • 3. The height ul'the side property line knee to he shared with Ms. Dottie Fink shall • <br /> be limited to 6'3" as measured from the applicant's side of the knee and may <br /> _ increase slightly to a maximum height ol'6'6" to roach the adjoining Fenix m'uncl <br /> of the applicant's rear fence. fhe design of this fence shall be as proposed by the <br /> Deikes and shall consist of redwood fencing with pressure-treated vertical support <br /> posts which are treated with creosote at the bottom of the post. At the intersection <br /> of the side and rear property lines and the juncture of the three properties of Fink, it <br /> Deike,and Pretzel, the height of the side property line knee shall he no more than k • <br /> six(6) inches higher than the existing knee. <br /> 4. - The height of the rem property line fence to be shared with Mr. Cad Pretzel shall - --- <br /> be limited to 6'6"as measured from the applicants'side of the fence and shall be <br /> • <br /> designed to match the fence on the applicants'southern property line, The <br /> remaining two panels of Mr. Pretzel's rear property line fence shall remain intact, <br /> although Mr. Pretzel has the option of adding finish materials on his side of the <br /> two panels shared with Ms. Fink so they better match the new property line fence f <br /> shared with the Deikes. The applicants have no responsibilities regarding the rear <br /> property line fencing shared by Ms. Pink and Mr. Pretzel, - <br /> r <br /> 5. 'Me applicants shall pay for the new side property-line fence with the cost of knee - - - - - - <br /> materials shared equally with Ms. Fink. The applicants shall he responsible for the <br /> demolition()tithe existing fence,hauling away any debris as a result of knee <br /> removal,construction of the new fence,and the labor costs of the construction of <br /> the new fence. <br /> M <br /> 6, _ The applicants are responsible for the demolition of the existing rear property-line <br /> fence, installation of the new fence,and the labor costs of the construction of the - — ••., , <br /> • -- new fence. Mr. Pretzel shall be responsible for hauling away all debris from the I, <br /> - fence demolition. Mr. Pretzel shall pay for half of the cost of the fence materials <br /> only(not the labor for construction of the fence)within two weeks of receiving the <br /> materials purchase receipts from the Deikes,or within any other time frame,,greed - <br /> upon between the two neighbors. -- <br /> ;r <br /> - 7• The applicants shall avoid damaging Mt Pretzel's mowstr',,located within his rear <br /> • <br /> • <br /> • <br /> • <br />