Laserfiche WebLink
LOCAL STR: ETS AND ROADS <br /> Boulevard improvements,Tennyson Road grade <br /> separation. <br /> • South County Major Roadways: East-west <br /> connector in North Fremont and Union City, 1- <br /> 680/1-880 cross connectors,Fremont Boulevard <br /> improvements,upgrades to the relinquished <br /> Route 84 in Fremont,Central Avenue <br /> Overcrossing,Thornton Ave widening,Mowry <br /> Ave., Newark local streets. <br /> • East County Major Roadways: Greenville Road <br /> widening,El Charro Road improvements, <br /> Dougherty Road widening,Dublin Boulevard <br /> widening,Bernal Bridge construction. <br /> • Countywide Freight Corridors: Outer Harbor <br /> Intermodal Terminal at the Port of Oakland,7th <br /> Street grade separation and roadway <br /> improvement in Oakland,as well as truck routes <br /> serving the Port of Oakland. <br /> Projects will be developed by local agencies working <br /> in cooperation with neighboring jurisdictions and the <br /> Alameda CTC to reduce congestion,remove <br /> bottlenecks, improve safety,enhance operations,and <br /> enhance alternatives to single occupant auto travel in <br /> these corridors.Projects will be funded based on <br /> project readiness,constructability, geographic equity, <br /> and cost effectiveness as determined by the Alameda <br /> CTC working with local jurisdictions as part of the <br /> Alameda CTC Capital Improvement Program which <br /> is updated every two years. <br />