My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
041712
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2012 11:33:58 AM
Creation date
4/12/2012 11:33:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/17/2012
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A: Full List of TEP Investments by Mode <br /> Mode Investment of Total <br /> Project/Program $Amount <br /> Category Funds <br /> North County Example Projects <br /> Solano Avenue Pavement resurfacing& <br /> beautification; San Pablo Avenue <br /> Improvements; SR 13/Ashby Avenue <br /> Corridor; Marin Avenue local road <br /> safety; Gilman railroad crossing; Park <br /> Street, High Street,and Fruitvale Bridge <br /> Replacement; Powell Street Bridge <br /> widening at Christie; East 14th Street; <br /> Oakland Army Base transportation <br /> infrastructure improvements <br /> Central County Example Projects <br /> Crow Canyon Road safety; San Leandro <br /> LS&R"; Lewelling Blvd/Hesperian Blvd.; <br /> Tennyson Road Grade Separation <br /> Major Commute South County Example Projects <br /> Corridors,Local East-West Connector in North Fremont <br /> Bridge Seismic and Union City; 1-680/1-880 cross 10% <br /> Local Safety connectors;widen Fremont Boulevard <br /> Streets& from I-88o to Grimmer Boulevard; <br /> Roads(3o%) upgrades to relinquished Route 84 in <br /> Fremont; Central Avenue overcrossing; <br /> Thornton Ave widening; Newark LS&R <br /> East County Example Projects <br /> El Charro road improvements; <br /> Dougherty Road widening; Dublin <br /> Boulevard widening; Greenville Road <br /> widening; Bernal Bridge Construction <br /> Sub-total $639.0 <br /> Countywide Freight Corridors <br /> Outer Harbor Intermodal Terminal; 7th <br /> Street Grade Separation and Roadway <br /> Improvement; Truck Routes serving the <br /> Port of Oakland <br /> Sub-total $161.0 <br /> Direct Allocation <br /> to Cities and Local streets and roads program $ •548.03 20% <br /> County <br /> TOTAL $2,348.03 30% <br /> Notes:Priority implementation of specific investments and amounts for fully defined capital projects and phases will be determined as part of <br /> the Capital Improvement Program developed through a public process and adopted by the Alameda CTC every two years and will include <br /> geographic equity provisions. <br /> All recipients of sales tax funds will be required to enter into agreements which will include performance and accountability measures. <br /> 'This includes$3o million for San Leandro local streets and roads improvements <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.