Laserfiche WebLink
Draft Memorandum lune 11, 2013 <br /> EPSP Alternatives Infrastructure Cost Burden Review Page 2 <br /> Key Findings <br /> The key findings from this preliminary financial feasibility review are summarized in Figure 1 <br /> and further described below. <br /> • The initial financial feasibility screen suggests that four of the development alternatives are <br /> marginally feasible from the perspective of a real estate developer(s), while one is likely <br /> infeasible and the other is likely to be feasible. These findings are based on the relationship <br /> between potential finished building values and the required infrastructure investments and <br /> other costs necessary to create this value. Specifically, one feasibility measure suggests that <br /> all feasibility alternatives fall slightly above the acceptable range of 15 percent. However, <br /> the alternatives perform more favorably based on the Tax Burden Threshold test. <br /> • The six alternatives do not differ significantly in terms of infrastructure costs (i.e., type and <br /> amount of vertical development). While Alternative 6 appears to be the most feasible due to <br /> the largest number of residential units, larger differences between the alternatives are likely <br /> to depend on the relative market performance of specific product types, factors that have yet <br /> to be evaluated in detail. In addition, the likely success of all six alternatives from an <br /> economic perspective will require relatively positive market trends and that other unknown <br /> cost and risk factors fall within a reasonable range (e.g., infrastructure costs, entitlement <br /> changes, delays, etc.). <br /> • As in the prior EPS analysis, estimates of applicable development fees and connection <br /> charges have been included. These fees and charges are significant, especially for sewer and <br /> water services, and combined represent between 66 and 79 percent of the total backbone <br /> infrastructure burden. Development impact fees and utility connection ctarges are paid for <br /> by vertical developers (e.g., home builders) and thus could be at least partially discounted <br /> from the "rule-of-thumb" feasibility tests included herein. However, the size of these fees <br /> relative to typical development projects of this nature suggest that they should be considered <br /> as part of the assessment of overall project feasibility. <br /> • The results of the Infrastructure Cost Burden Review are preliminary and provide a high-level <br /> screen for"fatal flaws" in the alternative program use mixes. The intents to provide an <br /> early-stage assessment that helps to guide refinement of EPSP planning parameters. Future <br /> analysis should consider program phasing (e.g., market absorption relative to required <br /> infrastructure investment), more detailed assessments of specific real estate product types, <br /> and refined infrastructure cost analysis, including potential off-site costs, if any. <br /> P:1210001 21090EastPleasanton\Report\Infrasvunure Burden MemorandumWrafl f(6.10)121090_rnframmo61013.docx <br />