Laserfiche WebLink
Draft Memorandum lune 11, 2013 <br /> EPSP Alternatives Infrastructure Funding Capacity Page A-1 <br /> Appendix Figure 1. Program Alternatives <br /> EPSP Alternative Program <br /> Use 1 2 3 a 5 6 <br /> Residential(Dwelling Units) <br /> Attached' <br /> 30 du/ac(MR) 155 412 493 200 157 138 <br /> 30 du/ac(BMR) 150 214 257 192 263 342 <br /> 23 du/ac 195 335 474 250 283 322 <br /> Detached <br /> 11-16 du/ac 0 110 110 0 275 873 <br /> 3-8 du/ac SQ 355 376 641 778 604 <br /> Residential Total 1,000 1,426 1,710 1,283 1,756 2,279 <br /> Retail(Square Feet) <br /> 0.35 FAR 91,000 91,000 91,000 91,000 91,000 91,000 <br /> Office Campus(Square Feet) <br /> 0.35 FAR 442,000 640,000 442,000 442,000 442,000 442,000 <br /> Industrial/Flex(Square Feet) <br /> 0.31 FAR 1,422,000 1,283,000 1,396,000 2,296,000 1,148,000 1,148,000 <br /> Destination Use Yes Yes Yes Yes Yes Yes <br /> Source:Gates«Associates and EPS <br /> 1 Includes a mix of Market Rate(MR)and Below Market Rate IBMRI units.BMRS comprise 15%of total and are provided in high-density residential projects. <br /> EPS conservatively assumes that Operations Service CenterlOSCI and Transfer Station(T5)do not contribute to infrastructure feasibility.However,the land for the 05C <br /> and TS is assumed to be developed with value-generating uses. <br /> P:1121 000\321090EastPleasan ton\ReporBInfrastructure Burden MemorandumWraft.1(6.10)\121090_fnramm061013.docx <br />