• <br /> Draft Memorandum July 25, 2013 <br /> EPSP Infrastructure Feasibility Analysis Page 7 <br /> Table 4 — Cost/Value Ratio and Tax Burden Feasibility Summary (adjusted building <br /> values) <br /> Option <br /> Item 1 4 5 6 <br /> Cost/Value Ratio Test <br /> Infrastructure Costs(rounded) <br /> Backbone Infrastructure $61,471,000 $63,312,000 $61,138,000 $62,087,000 <br /> Off-Site Utility Improvements' $5,000,000 $5,000,000 $5,000,000 $5,000,000 <br /> Potential Relocation of OSC and TS $10,000,000 $0 $10,000,000 $10,000,000 <br /> Fees and Connection Charges' $115,587,450 $143,241,954 $134,887,864 $186,124,558 <br /> Total Infrastructure Cost Burden $192,058,450 $211,553,954 $211,025,864 $263,211,558 <br /> Development Value $878,807,000 $845,272,000 $1,010,055,000 $1,441,205,000 <br /> Infrastructure Cost/Value Ratio 21.9% 25.0% 20.9% 18.3% <br /> Tax Burden Threshold Ten <br /> CFD Bond Proceeds and Issuance Cost' $69,794,550 $71,727,600 $69,444,900 $70,441,350 <br /> Proceeds Required for Annual Debt Service° $6,334,302 $6,509,738 $6,302,569 $6,393,003 <br /> Debt Coverage Factor 120% 120% 120% 120% <br /> Special Tax Revenue Required(Annual) $7,601,162 $7,811,686 $7,563,083 $7,671,604 <br /> Potential Special Tax(%of Development Value) 0.86% 0.92% 0.75% 0.53% <br /> 'Reflects a conservative"place-holder"assumption of$4 million to cover any upgrades to recycled water exchange program to attain required <br /> water supply and$1 million to cover Stanley Boulevard frontage cost to County and any additional off-site improvements that may be necessary. <br /> ° Include water,wastewater,impervious surface,public facilities,traffic development,Tri-Valley Transportation Committee, school,park dedication, <br /> and 615 fees based on the City's January 2013 fee schedule. <br /> 'Assumes a Community Facilities District bond(CFD)is used to cover backbone and off-site infrastructure,but not fees(bond issuance costs <br /> assumed at 5 percent of bond value). <br /> °Assumes an Interest rate 6.5%for a 20-year term. <br /> Source: Kier&Wright Civil Engineers Surveyors and EPS. <br /> Feasibility Considerations <br /> While this analysis provides a number of feasibility measures for the EPSP development options, <br /> there are still unresolved factors that will affect development feasibility of new growth. These <br /> key factors are described below. <br /> Inclusionary Housing Requirements <br /> This analysis assumes that the Project will meet its inclusionary requirement of 20 percent of for- <br /> sale units and 15 percent of rental units based on the City's existing affordable housing policy. <br /> All inclusionary units are assumed to be accommodated in the high density product type. <br /> Inclusionary housing requirements have substantial impacts on land values and have historically <br /> varied for developments in the City. To the extent that lower density product types would be <br /> responsible for their respective share of inclusionary housing, development feasibility of the <br /> Project would be weakened. <br /> For illustrative purposes of bracketing a range of potential outcomes, EPS evaluated residential <br /> land values for each residential product type under the existing inclusionary housing fee as well <br /> P:\221 0 0 011 21 0 9 0Easi p/easanton IFeportlfnfrasrructure Burden Memorandumt121090_Inha mm3_072413.doer <br />