Laserfiche WebLink
Draft Memorandum July 25, 2013 <br /> EPSP Infrastructure Feasibility Analysis Page 8 <br /> as with the inclusionary housing requirements. As shown in Table 5, these policies have <br /> substantial implications for the land values in the Project ranging as much as $1 million per acre. <br /> Particularly notable is the impact on the lower density housing that has higher development cost <br /> and is more costly to accommodate inclusionary requirements in. However, some of the land <br /> value reductions could be remedied with tax credits and other tools. <br /> Table 5 — Comparison of Land Values Under Various Inclusionary Housing <br /> Requirements <br /> Resulting Land Value <br /> Assumed Price per unit or <br /> Item per unit sq.ft. Per Acre Notes <br /> Residential (with inclusionary fees) <br /> 4 du/acre $1,400,000 $308,000 $1,232,000 <br /> 8 du/acre $975,000 $287,000 $2,298,000 <br /> 11 du/acre $800,000 $191,000 $2,097,000 <br /> 23 du/acre $450,000 $100,000 $2,290,000 <br /> 30 du/acre $372,000 $15,000 $450,000 surface <br /> I nclusionary <br /> Residential (blended) Requirement <br /> 4 du/acre 20% $1,177,639 $102,200 $409,400 <br /> 8 du/acre 20% $837,639 $165,200 $1,320,000 <br /> 11 du/acre 20% $697,639 $102,600 $1,129,600 <br /> 23 du/acre 20% $417,639 $63,200 $1,452,600 <br /> 30 du/acre 15% $346,050 ($7,808) ($233,350) surface <br /> Cost Allocation and Fee Credits <br /> As described above, there are significant differences in the financial performance of various land <br /> use types, with lower to medium density single family units performing the best and industrial <br /> uses performing the worst. This suggests, among other things, that an effective development <br /> program will require a strategic allocation of project-wide costs across land uses. In addition, <br /> cost sharing tools would need to be developed to ensure that revenue and cost allocation <br /> between property owners is equitable. <br /> Another key cost allocation issue has to do with the availability of outside funding. As noted, the <br /> current analysis assumes that all EPSP developers and/or builders pay applicable development <br /> impact fees and connection charges. These fees are designed to cover a variety of off-site and <br /> on-site infrastructure costs. To the extent that credits or contributions towards transportation or <br /> other infrastructure improvements in EPSP would be provided to the Project, such as traffic fee <br /> credits, overall feasibility would improve. The fees allocated to regional serving transportation <br /> 4 The current affordable housing fee is currently being updated. <br /> P:1121 000�121090Eas tPleesanton\Beport\Infrastructure Burden Mem,andump21090_Inha mm3 072a13.docx <br />