Draft Memorandum July 25, 2013 <br /> EPSP Infrastructure Feasibility Analysis Page 9 <br /> infrastructure range from $14 million to $19 million are not currently allocated to on-site EPSP <br /> improvements. Conversely, it should be noted, that the fees do not cover the entire cost <br /> associated with building the park and recreation-related improvements envisioned for the plan. <br /> Phasing <br /> Specific phasing of the EPSP could have substantial implications on its feasibility. There are two <br /> phasing considerations that include absorption and geographic positioning of subareas within the <br /> plan. Given the level of uncertainty about future development timing and conditions, phasing is <br /> not considered in this analysis. <br /> The EPSP will take a number of years to build out. Given the amount of development, the plan <br /> will be subject to various changes in economic and real estate conditions over multiple economic <br /> cycles that will impact absorption of new space. The relationship between market absorption and <br /> the phasing of infrastructure costs will determine the creation of real estate value over time. To <br /> the extent that absorption is strong and real estate values are high, the overall feasibility of the <br /> plan would improve. It is worth noting that growth area and growth management allocations <br /> create absorption challenges due to a residential development cap, which would adversely impact <br /> development feasibility of the EPSP. <br /> The geographic phasing of subareas could also have an important implication on performance. <br /> Large-scale development projects often require "over-sizing" of backbone infrastructure in early <br /> phases. To the extent that large infrastructure items, such as the El Charro Road/Stanley <br /> Boulevard undercrossing and El Charro Road Improvements could be deferred, the overall <br /> feasibility of the EPSP would improve. The gap between infrastructure costs and subsequent <br /> land or building sales in each phase should be minimized to reduce the cost burden for the <br /> Project. A detailed phasing strategy should be developed in the subsequent planning efforts. <br /> Financing <br /> The development community is likely to pursue a variety of financing mechanisms to cover the <br /> infrastructure costs, including conventional debt, private equity, CFD proceeds, and others. A <br /> more strategic approach to financing, for example, one that combines both CFD proceeds with <br /> developer equity and conventional debt, could increase the financial feasibility of the program <br /> options. <br /> Methodology and Assumptions <br /> This section describes the key methodology and assumptions. Appendix A presents detailed <br /> data and calculations, including the program options use mix, development values (also <br /> discussed below), impact fee calculations, and residual land value estimates by land use. <br /> Development Value <br /> The Cost Burden Review analysis considers the potential market value of various development <br /> types envisioned by the EPSP, including residential, retail, office, and industrial/flex uses (see <br /> Appendix A for detailed market value assumptions). EPS assumes real estate values that are <br /> typical of the Pleasanton real estate market. This analysis relies on value assumptions that are <br /> representative of new development projects. These values are generally conservative, with the <br /> analysis seeking to avoid overestimation of building values and supportable infrastructure cost. <br /> P:1121000\121090EasWMeasan fon\ReportUnfrastructure Burden Memorandum\121090_inha_mm3_072913.docx <br />