Laserfiche WebLink
EXHIBIT C-1 <br /> PROJECT BUDGET <br /> Combined Phase 1& Phase 11 <br /> Land Total Cost <br /> Direct Land Cost $10,088,496 <br /> Title&Escrow-Land Closing $0 <br /> Legal-Acquisition $20,000 <br /> Predevelopment Loan Interest(MidPen) $10,293 <br /> Off-Site Improvements $400,000 <br /> TOTAL LAND COST/ACQUISITION COST $10,518,789 <br /> Temp Relocation Budget $320,000 <br /> Perm Relocation Budget $414,800 <br /> Relocation Consultant Fee $150,000 <br /> TOTAL RELOCATION EXPENSES $884,800 <br /> �fl£ ,.. New Constuction .. .,.;. Total Cost <br /> Site Work $2,604,232 <br /> Residential Structures $26,962,448 <br /> Photovoltaic System $213,356 <br /> Owner's Contingency $3,024,024 <br /> STRUCTURES $32,804,060 <br /> General Requirements $1,601,869 <br /> Contractor Overhead $641,543 <br /> Contractor Profit $641,543 <br /> General Liability Insurance $269,112 <br /> TOTAL NEW CONSTRUCTION COSTS $35,958,127 <br /> Architecture and Engineering <br /> u <br /> _, Tota Cost <br /> Conceptual-Site Analysis $40,800 <br /> Schematic Design $129,400 <br /> Design Development $120,000 <br /> Construction Documents $368,400 <br /> Consultants:Structural,MEP,Landcsape $363,840 <br /> Design $1,022,440 <br /> Supervision(Construction Administration) $114,000 <br /> Reimbursables&Printing $40,000 <br /> TOTAL ARCHITECTURAL COSTS $1,176,440 <br /> Civil Engineering $264,900 <br /> Geotech report $7,500 <br /> Geotech testing during construction $40,000 <br /> Structural Materials Testing During Construction $150,000 <br /> Environmental and Phase I $61,210 <br /> Fire Sprinkler Schematic Design $20,000 <br /> VE/Construction Estimating $105,000 <br /> Construction Management $292,000 <br /> Joint Trench Consultant $94,000 <br />