My WebLink
|
Help
|
About
|
Sign Out
12 ATTACHMENT 6
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
031814
>
12 ATTACHMENT 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 3:28:43 PM
Creation date
3/12/2014 3:53:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2014
DESTRUCT DATE
15Y
DOCUMENT NO
12 ATTACHMENT 6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the residential neighboring fence line on the south side of the Arroyo to the proposed <br /> buildings, although the distance actually goes much farther from some houses on the <br /> south side. <br /> Mr. Ebrahimi then presented a slide showing the current view of the proposed <br /> apartment community taken from the closest neighbor in the existing residential <br /> development on the south side, with the proposed landscaping shown at a five-year <br /> maturity. He indicated that in reviewing the Design Guidelines and meeting with staff <br /> and the neighbors, they developed the site layout by adhering to the required setbacks <br /> and stepping the buildings for better interface with the surrounding uses. He noted that. <br /> Buildings C and D were designed with two- and three-story elements, with all <br /> three-story components in Building D and the recreation building on Building C's <br /> two-story stepping up to a three-story on the three units to its left. He explained that the <br /> reason they did that was to try and reduce the height of the buildings on the south side, <br /> based on their meeting with staff and the neighborhood. He stated that they were <br /> asked to lower the units on the south side at one point so they could take it away from <br /> West Las Positas Boulevard, but the ultimate direction that they received was to step <br /> the site and have more two and three stories on the south side, which is what they have <br /> done, and then step it up to four stories. He noted that the center of the community is <br /> all four stories, including the four-story element turns on Buildings A and B going up the <br /> paseo area, which are all internal; and to try and do three stories with four-story <br /> elements as it gets to West Las Positas Boulevard. He noted that it was kind of a mixed <br /> decision as nobody wanted to see it be all four stories; however, as they ultimately had <br /> to have the 177 units minimum/maximum required for this site, they had to see what the <br /> best positioning was, and this is what they came up with. <br /> Mr. Ebrahimi stated that while the Design Guidelines required a minimum of <br /> 177 covered parking spaces, they have provided 75 additional carports. He stated that <br /> they believe both carports on the west side of the community will be well designed, will <br /> provide an added visual screen as opposed to looking at a row of cars, and will provide <br /> added value to the community. He indicated that he has been in contact with Doug <br /> Giffin of Chamberlin Associates, the owner of the commercial building to the west. He <br /> noted that Mr. Giffin wants to look at the ultimate design of the carports to determine if <br /> that is something Chamberlin can find acceptable, and he stated that they will continue <br /> working with Mr. Giffin towards that end. He added that there will be a row of six-foot <br /> tall shrubs installed on the west side behind the carports, in addition to the fencing to be <br /> located along that property line. He indicated that they will be providing more detail on <br /> this as the project moves forward. <br /> Mr. Ebrahimi then showed a slide of the main entrance to the project being served at <br /> the intersection of West Las Positas Boulevard and Hacienda Drive. He pointed out <br /> Building B where the plaza with a fountain is located, as well as the leasing office <br /> located right behind the fountain area. He indicated that in addition to the main <br /> entrance, they have also provided an access route from West Las Positas Boulevard <br /> into the project at the westerly end. He indicated that they had originally proposed this <br /> as an emergency vehicle access (EVA), but staff had asked that this roadway be <br /> EXCERPT: PLANNING COMMISSION MINUTES, September 11, 2013 Page 4 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.