Laserfiche WebLink
Jenny Soo <br /> May 8,2015 <br /> Page 7 <br /> Cultural Resources <br /> Mitigation Measure 4.D-3:In the event that paleontological resources are encountered during the course <br /> of development, all construction activity must temporarily cease in the affected area(s) <br /> until the uncovered fossils are properly assessed by a qualified paleontologist and <br /> subsequent recommendations for appropriate documentation and conservation are <br /> evaluated by the Lead Agency. Excavation or disturbance may continue in other areas of <br /> the site that are not reasonably suspected to overlie adjacent or additional <br /> paleontological resources. <br /> Mitigation Measure 4.D-4:The site has no known human remains, including those interred outside of <br /> formal cemeteries. However, it is impossible to be sure about the presence or absence <br /> of human remains on a site until site excavation and grading occurs. As required by <br /> State law, in the event that such remains are encountered,there shall be no further <br /> excavation or disturbance of the site or any nearby area reasonably suspected to overlie <br /> adjacent human remains. The County Coroner would be contacted and appropriate <br /> measures implemented. These actions would be consistent with the State Health and <br /> Safety Code Section 7050.5,which prohibits disinterring, disturbing,or removing human <br /> remains from any location other than a dedicated cemetery. <br /> Similar to the 2014 project,the 2015 project's ground disturbance has the potential to encounter <br /> previously unknown paleontological resources or human remains. The level of ground disturbance <br /> resulting from the 2015 project is expected to be similar to that of the 2015 project. As noted in the <br /> 2014 Addendum, in the event that paleontological resources or human remains are found, <br /> implementation of Mitigation Measure 4.D-3 and 4.D-4 would require construction activities to <br /> temporarily stop and the implementation of appropriate actions to mitigate impacts. As such,with the <br /> implementation of Mitigation Measure 4.D-3 and 4.D-4,cultural resource impacts related to the 2015 <br /> project would continue to be less than significant. <br /> Hazards and Hazardous Materials <br /> Mitigation Measure 4.G-5:c.The following condition shall be included in any PUD development approval <br /> for all the potential sites for rezoning: Prior to the issuance of a grading permit or <br /> building permit,whichever is sooner,the project Applicant shall submit verification from <br /> the FAA, or other verification to the satisfaction of the City Engineer or Chief Building <br /> Official,of compliance with the FAA Part 77(Form 7460 review) review for construction <br /> on the project site. <br /> The 2015 project is located on the same site and at the same distance from the Livermore Municipal <br /> Airport as the 2014 project. The project site is not located within the airport's Airport Protection Area, <br /> Airport Influence Area, or Federal Aviation Regulation (FAR) Part 77 height restriction space. <br /> Nonetheless,similar to the 2014 project,the 2015 project would be required to verify compliance with <br /> FAA Part 77 with regards to building height, in compliance with Mitigation Measure 4.G-5. As such, <br /> potential aviation hazard impacts related to the 2015 project would continue to be less than significant. <br />