My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:53:30 AM
Creation date
6/11/2015 12:21:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jenny Soo <br /> May 8,2015 <br /> Page 8 <br /> Noise <br /> Mitigation Measure 4.J-1:In addition to requiring that all project developers comply with the applicable <br /> construction noise exposure criteria established within the City's Municipal Code 9.04.100, <br /> the City shall require developers on the potential sites for rezoning to implement <br /> construction best management practices to reduce construction noise, including: <br /> a. Locate stationary construction equipment as far from adjacent occupied buildings as <br /> possible. <br /> b. Select routes for movement of construction-related vehicles and equipment so that <br /> noise-sensitive areas, including residences, and outdoor recreation areas, are <br /> avoided as much as possible. Include these routes in materials submitted to the City <br /> of Pleasanton for approval prior to the issuance of building permits. <br /> c. All site improvements and construction activities shall be limited to the hours of 8:00 <br /> a.m.to 5:00 p.m., Monday through Saturday. In addition, no construction shall be <br /> allowed on State and federal holidays. If complaints are received regarding the <br /> Saturday construction hours,the Community Development Director may modify or <br /> revoke the Saturday construction hours. The Community Development Director may <br /> allow earlier"start-times"for specific construction activities (e.g., concrete <br /> foundation/floor pouring), if it can be demonstrated to the satisfaction of the <br /> Community Development Director that the construction and construction traffic <br /> noise will not affect nearby residents. <br /> d. All construction equipment must meet DMV noise standards and shall be equipped <br /> with muffling devices. <br /> e. Designate a noise disturbance coordinator who will be responsible for responding to <br /> complaints about noise during construction. The telephone number of the noise <br /> disturbance coordinator shall be conspicuously posted at the construction site and <br /> shall be provided to the City of Pleasanton. Copies of the construction schedule shall <br /> also be posted at nearby noise-sensitive areas. <br /> Mitigation Measure 4.J-6c: For all of the potential sites for rezoning,the City shall require noise <br /> disclosures and noise complaint procedures for new residents at the project site. The <br /> requirement shall include a)a disclosure of potential noise sources in the project <br /> vicinity; b)establish procedures and a contact phone number for a site manager the <br /> residents can call to address any noise complaints. <br /> Similar to the 2014 project,the 2015 project would result in temporary construction noise, albeit to a <br /> lesser degree than the 2014 project due to the reduced unit count. However,with the implementation <br /> of Mitigation Measures 4.1-1 the applicant's contractor's would be required to minimize construction <br /> noise through strategic placement of equipment and vehicle routes, limited construction hours,and <br /> compliance DMV noise standards,and designation of a noise disturbance coordinator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.