My WebLink
|
Help
|
About
|
Sign Out
08 ATTACHMENTS 1- 6
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
120115
>
08 ATTACHMENTS 1- 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 2:37:56 PM
Creation date
11/12/2015 11:13:56 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/1/2015
DESTRUCT DATE
15Y
DOCUMENT NO
08 ATTACHMENTS 1-6
NOTES
THIS ITEM WAS CONTINUED FROM 11-3-2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. All top and toe of slope elevations. <br /> c. Top and toe of all retaining wall elevations. <br /> 81. The record-grading plan for each lot is to be submitted to the Chief Building <br /> Official before the first house final. <br /> 82. The soils engineer shall certify the pad compactions of all lots containing fill to <br /> the satisfaction of the Chief Building Official prior to the issuance of building <br /> permits. <br /> Engineering Division <br /> 83. The project applicant or developer shall dedicate to the City for street right-of- <br /> way purposes those parcels of land intended to be public streets. <br /> 84. The project applicant or developer and/or the project developer's contractor(s) <br /> shall obtain an encroachment permit from the City Engineer prior to moving any <br /> construction equipment onto the site. <br /> 85. A "Conditions of Approval" checklist shall be completed and attached to all plan <br /> checks submitted for approval indicating that all conditions have been satisfied. <br /> 86. The project applicant or developer shall comply with the recommendations of the <br /> project's geotechnical consultant. The project applicant's or developer's <br /> geotechnical consultant shall review and approve all foundation, retaining wall, <br /> and drainage geotechnical aspects of the final development plans to ensure that <br /> the recommendations have been properly incorporated into the development. <br /> The consultant shall certify by writing on the plans or as otherwise acceptable to <br /> the City Engineer that the final development plan is in conformance with the <br /> geotechnical report approved with the project. <br /> 87. The project applicant or developer shall arrange and pay for the geotechnical <br /> consultant to inspect and approve all foundation, retaining, and wall and drainage <br /> geotechnical aspects of project construction. The consultant shall be present on <br /> site during grading and excavation operations. The results of the inspections and <br /> the as-built conditions of the project shall be certified in writing by the <br /> geotechnical consultant for conformance with the approved plans and <br /> geotechnical report and submitted to the City Engineer for review and approval <br /> prior to occupancy. <br /> 88. The project applicant or developer shall grant an easement to the City over those <br /> parcels needed for public service easements (PSE) and which are approved by <br /> the City Engineer, or other easements, which may be designated by the City <br /> Engineer. <br /> Page 16 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.