My WebLink
|
Help
|
About
|
Sign Out
08 ATTACHMENTS 1- 6
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
120115
>
08 ATTACHMENTS 1- 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 2:37:56 PM
Creation date
11/12/2015 11:13:56 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/1/2015
DESTRUCT DATE
15Y
DOCUMENT NO
08 ATTACHMENTS 1-6
NOTES
THIS ITEM WAS CONTINUED FROM 11-3-2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
89. The project developer shall create public service easements (PSEs), and private <br /> utility easements, and other easements as necessary across the project for the <br /> benefit of the individual lots, subject to the review and approval of the City <br /> Engineer. <br /> 90. The project applicant or developer shall construct vertical P.C.C. curbs and <br /> gutters within this development unless otherwise approved by the City Engineer. <br /> When the sidewalk is adjacent to the curb and gutter, they shall be poured <br /> monolithically. <br /> 91. All existing septic tanks or holding tanks shall be properly abandoned, pursuant <br /> to the requirements of the Alameda County Department of Health Services prior <br /> to the start of grading operations, unless specifically approved by the City <br /> Engineer. <br /> 92. All unused utility laterals, including but not limited to water, sewer and storm <br /> laterals, shall be abandoned or removed as per City standard specifications and <br /> details to the satisfaction of the City Engineer and Chief Building and Safety <br /> Official. <br /> 93. All dry utilities (electric power distribution, gas distribution, communication <br /> service, cable television, street lights and any required alarm systems) required <br /> to serve existing or new development shall be installed in conduit, underground <br /> in a joint utility trench. <br /> 94. Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full expense <br /> to the project applicant or developer. This shall include slurry seal, overlay, or <br /> street reconstruction if deemed warranted by the City Engineer. <br /> 95. This approval does not guarantee the availability of sufficient water and/or sewer <br /> capacity to serve the project. <br /> 96. The tentative map shall contain a brief legal description of any parcel being re- <br /> subdivided, a statement of lot and total acreage, and a statement referencing any <br /> separate documents required to be recorded with the map. <br /> 97. There shall be no direct roof leaders connected to the street gutter or storm drain <br /> system, unless otherwise approved by the City Engineer. <br /> 98. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area <br /> of a dedicated public street or public service easement approved by the City <br /> Engineer shall be privately maintained by the property owners or through an <br /> association approved by the City. <br /> 99. All existing drainage swales that are filled shall have sub drains installed unless <br /> otherwise approved by the City Engineer and the developer's soils engineer. All <br /> Page 17 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.