Laserfiche WebLink
B. Construction Requirements <br /> The Construction General Permit's construction requirements include, but are not <br /> limited to, the following: <br /> Construction activities (including other land-disturbing activities) that disturb one <br /> acre or more (including smaller sites that are part of a larger common plan of <br /> development) are regulated under the NPDES stormwater program. Operators of <br /> regulated construction sites are required to develop and implement a Stormwater <br /> Pollution Prevention Plan and to obtain a Construction General Permit (NOI) from <br /> the State Water Resources Control Board to discharge stormwater: <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/docs/finalcon <br /> stpermit.pdf <br /> Stormwater <br /> 1. The project developer shall submit a Stormwater Pollution Prevention Plan <br /> (SWPPP) for review by the City Engineer/Chief Building Official prior to <br /> issuance of building or engineering permits. A reviewed copy of the SWPPP <br /> shall be available at the project site until engineering and building permits <br /> have been signed off by the inspection departments and all work is complete. <br /> A site specific SWPPP must be combined with proper and timely installation <br /> of the BMPs, thorough and frequent inspections, maintenance, and <br /> documentation. Failure to comply with the reviewed construction SWPPP <br /> may result in the issuance of correction notices, citations or stop work orders. <br /> 2. The amendments to the SWPPP and all the inspection forms shall be <br /> completed and available at the site for inspection by the city, county or state <br /> staff. <br /> 3. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measure, shall be included in the SWPPP and implemented as approved by <br /> the City. <br /> a) The project developer shall include erosion control/stormwater quality <br /> measures on the final grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the storm drain <br /> system. Such measures may include, but are not limited to, <br /> hydroseeding, hay bales, sandbags, and siltation fences and are subject <br /> to the review and approval of the City Engineer/Chief Building Official. If <br /> no grading plan is required, necessary erosion control/stormwater quality <br /> measures shall be shown on the site plan submitted for an on-site permit, <br /> subject to the review and approval of the Building and Safety Division. <br /> The project developer is responsible for ensuring that the contractor is <br /> aware of and implements such measures. <br /> Page 14 of 17 <br />