b) All cut and fill slopes shall be revegetated and stabilized after completion <br /> of grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary <br /> irrigation system to ensure that the grasses are established before <br /> October 15. No grading shall occur between October 15 and April 15 <br /> unless approved erosion control/stormwater quality measures are in place, <br /> subject to the approval of City Engineer/Chief Building Official. Such <br /> measures shall be maintained until such time as permanent landscaping is <br /> place. <br /> c) Gather all sorted construction debris on a regular basis, place it in the <br /> appropriate container for recycling, and empty at least on a weekly basis. <br /> When appropriate, use tarps on the ground to collect fallen debris or <br /> splatters that could contribute to stormwater runoff pollution. <br /> d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked-on mud and dirt from these areas before sweeping. <br /> e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> replace filter materials to ensure effectiveness and to prevent street <br /> flooding. <br /> f) Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain system <br /> through being windblown or in the event of a material spill. <br /> g) Never clean machinery, equipment, tools, brushes, or rinse containers into <br /> a street, gutter, or storm drain. <br /> h) Ensure that concrete/gunite supply trucks or concrete/plaster operations <br /> do not discharge wash water into street, gutters, or storm drains. <br /> i) Equipment fueling area: Use off-site fueling stations as much as possible. <br /> Where on-site fueling occurs, use designated areas away from the storm <br /> drainage facility, use secondary containment and spill rags when fueling, <br /> discourage "topping off" of fuel tanks, place a stockpile of absorbent <br /> material where it will be readily accessible, and check vehicles and <br /> Page 15 of 17 <br />