My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
071916
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:28:00 PM
Creation date
7/13/2016 8:50:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Project Onowham and Approach <br />Project Approach <br />Based on our review of the Request for Proposals, we have put together a <br />scope of work that we believe responds to the City's objectives. This scope <br />details the tasks that ESA proposes to complete and deliver a Supplemental <br />EIR Environmental Impact Report (SEIR), which would focus in on three <br />key environmental issue areas, and would be tiered from the 2009 General <br />Plan EIR and the 2011 GPA EIR. <br />The City, as Lead Agency, may prepare a supplement to an EIR if only <br />minor additions or changes would be necessary to make the previous EIR <br />adequately apply to the project in the changed situation. The SEIR need only <br />present the information necessary to make the previous EIR adequate for the <br />project as revised. Thus, for purposes of the current SEIR, the project will <br />consist of further amendments to the Pleasanton General Plan, previous <br />amendments to which were analyzed in the GPA EIR. <br />The SEIR will be given the same kind of notice and public review as is given <br />to a Draft EIR (CEQA Guidelines Section 15087), and may be circulated by <br />itself without re- circulating the previous Draft or Final EIR. However, when <br />the City decides whether to approve the proposed project the decision - <br />making body shall consider the previous EIR as revised by the SEIR. A <br />finding under Section 15091 shall be made for each significant effect shown <br />in the previous EIR as revised. <br />Task 1. Project Initiation and Site Visit <br />In addition to meeting with City staff for a project kick -off meeting, ESA <br />will review the Administrative Draft General Plan Amendment and Zoning <br />Amendment, as provided by the City, and will request data vital to the <br />project in electronic format, including but not limited to. any updated <br />information concerning ongoing investigation and remediation of <br />contaminated soil and groundwater at the former Clorox campus. ESA will <br />begin the environmental and regulatory setting portions of the SEIR. and will <br />inform the City of any environmental constraints that arise during that work <br />that could help to shape the proposed project (i.e., make it a self - mitigating <br />project). <br />ESA will coordinate a visit for key personnel to the project site and <br />surrounding environs during which time ESA will photograph the site and <br />the surrounding area to document existing conditions. <br />Task 2. Notice of Preparation (NOP) <br />Although an NOP is not required for a Supplemental EIR, should the City <br />desire to issue one, ESA will prepare a NOP for review and revision by City <br />staff. The NOP will conform to CEQA Guidelines Sections 15082 and <br />15375, which require that at a minimum, a NOP include a project <br />description, a location map, and a summary of the potential environmental <br />effects of the project. ESA will file the NOP with the State Clearinghouse. <br />and provide three hard copies to the City and digital copies. Comments <br />1-4 CO at Pbesvmn Jenne (Nye Economic Development Gone EIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.