My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
100416
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:23:44 PM
Creation date
9/29/2016 2:50:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
15Y
DOCUMENT NO
21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
evolving as advances in renewable energy and storage technology change the economics <br /> associated with avoided costs, greenhouse gases priorities, and operational dynamics <br /> associated with grid management. This indicates some uncertainty in program design and <br /> delivery priorities. <br /> Energy Efficiency Potential <br /> The following section provides an estimate of the overall level of energy efficiency potential in <br /> Alameda County as derived from a publically available potential model, and also provides <br /> several examples of incremental potential not represented in this model that may be developed <br /> by CCA administered programs. <br /> Types of Energy Efficiency Forecasts and Alameda County Market Potential <br /> Forecasts of energy efficiency potential are generally based on three levels of screening, as <br /> illustrated in Error! Reference source not found. and discussed below. <br /> Figure 3. Diagram of Types of Energy Efficiency Potential <br /> Technical Potential <br /> Economic Potential <br /> Market <br /> Potential <br /> 1. Technical Potential Analysis.Technical potential is defined as the amount of energy <br /> savings that would be possible if all technically applicable and feasible opportunities to <br /> improve energy efficiency were taken, including retrofit measures, replace-on-burnout <br /> measures, and new construction measures. Technical potential varies over time depending <br /> on market adoption and saturation of existing technologies, and the development of new <br /> technologies that are more efficient than the current market baseline. It is also a very <br /> notional metric intended to provide a benchmark that compares the current market with a <br /> hypothetical market where the most current energy efficiency technologies have been <br /> installed, and all machines and systems may be upgraded to a high level of efficiency. <br /> F-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.