My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
100416
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:23:44 PM
Creation date
9/29/2016 2:50:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
15Y
DOCUMENT NO
21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Economic Potential Analysis. Using the results of the technical potential analysis, the <br /> economic potential is calculated as the total energy efficiency potential available when <br /> limited to only cost-effective measures. All components of economic potential are a subset <br /> of technical potential. Economic potential is less than technical potential because it considers <br /> the influence of financial payback on customer selection, along with regulatory requirements <br /> that exclude certain energy efficiency activates based on cost effectiveness criteria. <br /> Economic potential is also a notional metric which adjusts technical potential to account for <br /> various regulatory and market economic constraints. <br /> 3. Market Potential Analysis.The final output of most potential studies is a market potential <br /> analysis which is defined as the energy efficiency savings that could be expected to occur in <br /> response to specific levels of program funding and customer participation based on <br /> assumptions regarding market influences and barriers. All components of market potential <br /> are a subset of economic potential. Some studies also refer to this as the"Maximum <br /> Achievable Potential." Defining market potential requires an estimate of how much market <br /> activity occurs each year where there is an opportunity to install efficient equipment. The <br /> opportunity is often related to natural stock turnover(i.e., old equipment burns out and needs <br /> to be replaced) or the favorable economic conditions such that residents and businesses <br /> invest in energy efficiency, or the influence of codes and standards. Market potential <br /> generally does not exceed 1% of total electricity consumption in any given year,but is <br /> influenced by the level of spending and the development of new and innovative market <br /> interventions. <br /> The assessment of energy efficiency potential in Alameda County completed for this feasibility <br /> study used outputs from the 201347 and 201548 Energy Efficiency Potential and Goals studies <br /> developed by the CPUC. These CPUC studies define the technical and economic potential for <br /> energy efficiency in PG&E's service territory, and also determine the market potential used to <br /> set energy efficiency production goals and budgets for PG&E's energy efficiency programs. <br /> Because of its size, varied economy, diverse demographics, and range of climates it is likely that <br /> both energy use characteristics and the potential for energy efficiency in Alameda County is <br /> consistent with the potential for energy efficiency in PG&E's overall service territory, with some <br /> exceptions such as a reduced presence of agricultural and oil extraction loads found elsewhere in <br /> the state. For example, a review of Alameda County electric usage data provided to the MRW <br /> team for this analysis indicates that the residential sector accounted for 29% of sales to the <br /> County by PG&E in 2013 and 2104, with non-residential sales accounting for the remaining <br /> 71%. Similarly, the CEC electric demand forecast for the overall PG&E service territory49 <br /> indicates that the residential sector accounted for 31% of total system-wide sales for those same <br /> years, with nonresidential sales accounting for 69% of sales, consistent with the distribution of <br /> sales in Alameda County. Based on these consistencies in markets and energy usage, this <br /> analysis concludes that energy efficiency potential for electricity in PG&E's overall service <br /> 47 2013 California Energy Efficiency Potential and Goals Study,Final Report.Prepared for the California Public <br /> Utilities Commission by Navigant Consulting,Inc.February 14,2014 <br /> 48 Energy Efficiency Potential and Goals Study for 2015 and Beyond, Stage 1 Final Report.Prepared for the <br /> California Public Utilities Commission by Navigant Consulting,Inc.Reference No.: 174655,September 25,2015 <br /> 49 Form 1.1—STATEWIDE California Energy Demand 2015 Revised-Mid Demand Case,Electricity Consumption <br /> by Sector(GWh) <br /> F-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.