Laserfiche WebLink
ESA Memo to City of Pleasanton:June 13,2016 <br /> The table below summarizes the existing CCA programs in the Bay Area. <br /> TABLE 3:Summary of Community Choice Aggregation Programs in the Bay Area <br /> 31- Marin Clean Sonoma jCleanPower Peninsula <br /> Criterion Energy Clean <br /> Clean Power SF <br /> (MCE) Energy <br /> Launch Year 2010 2014 2016 2015 <br /> RE Content <br /> (target at 25% 33% 35% 50% <br /> launch) (Minimum) <br /> GHG-free 70%incL <br /> content(target 25% Parity w/PG&E N/A 20%L. <br /> at launch) Hydro <br /> RE Content 56% 36% N/A N/A <br /> (2015) <br /> GHG-free 66% 80% (incl. <br /> (including 9% N/A N/A <br /> content(2015) Hydro) L.Hydro) <br /> L Use of Yes Yes No No <br /> Unbundled RECs <br /> Rate savings S%below Current goal <br /> compared to IOU Parity PG&E Parity is 5%below <br /> (at launch) PG&E <br /> Primary Power Constellation Calpine& Currently <br /> Supplier(s)at Shell &Calpine lberdrola out to bid <br /> Launch <br /> Source: Peninsula Clean Energy Board Meeting,April 14,2016 <br /> Some of the key lessons of this comparison include: <br /> • Many CCAs are looking to exceed the equivalent of the state mandated RPS by using <br /> hydropower to further reduce GHG emissions while securing low cost supplies. These CCAs <br /> are setting forth strategies to provide cleaner power than can be provided by PG&E at lower <br /> rates. The option of Alameda CCA purchasing hydro power in order to reduce the GHG <br /> emissions from the power supply while gaining a cost advantage is a major element in the <br /> Study's Scenarios 2 and 3. <br /> • Both CleanPower SF and Peninsula Clean Energy do not include the use of unbundled <br /> Renewable Energy Credits. The use of these RECs,which involves purchasing of the energy <br /> credit without purchasing the associated power,is not considered in the analysis. The <br /> purchase of such unbundled REC's is controversial in some communities. <br /> • None of these CCAs are expected to rapidly build local renewable generation sources,but <br /> relied on large producers for their supplies in the short term. <br /> 10 <br />