Laserfiche WebLink
b No equipment may be stored within or beneath the driplines of the existing trees to <br /> be saved <br /> c No oil, gasoline, chemicals, or other harmful materials shall be deposited or <br /> disposed within the dripline of the trees or in drainage channels, swales, or areas <br /> that may lead to the dripline <br /> d No stockpiling/storage of fill, etc , shall take place underneath or within five feet of <br /> the dripline of the existing trees <br /> Building and Safety Division <br /> 109 At the time of building permit plan submittal, the project developer shall submit a final <br /> grading and drainage plan prepared by a licensed civil engineer depicting all final grades <br /> and on-site drainage control measures to prevent stormwater runoff onto adjoining <br /> properties <br /> 110 Prior to issuance of building permits, the applicant/developer shall submit a waste <br /> management plan to the Building and Safety Division The plan shall include the estimated <br /> composition and quantities of waste to be generated and how the project developer intends <br /> to recycle at least 75 percent of the total job site construction waste measured by weight or <br /> volume Proof of compliance shall be provided to the Chief Building Official prior to the <br /> issuance of a final building permit During construction, the project developer shall mark all <br /> trash disposal bins "trash materials only" and all recycling bins "recycling materials only " <br /> The project developer shall contact Pleasanton Garbage Service for the disposal of all <br /> waste from the site <br /> Engineering Department <br /> 111 A "Conditions of Approval" checklist shall be completed and attached to all plan checks <br /> submitted for approval indicating that all conditions have been satisfied <br /> 112 The project applicant shall comply with the recommendations of the project's geotechnical <br /> consultant The project applicant's geotechnical consultant shall review and approve all <br /> foundation, retaining wall, and drainage geotechnical aspects of the final development <br /> plans to ensure that the recommendations have been properly incorporated into the <br /> development The consultant shall certify by writing on the plans or as otherwise <br /> acceptable to the City Engineer that the final development plan is in conformance with the <br /> geotechnical report approved with the project <br /> 113 The project applicant shall arrange and pay for the geotechnical consultant to inspect and <br /> approve all foundation, retaining, and wall and drainage geotechnical aspects of project <br /> construction The consultant shall be present on site during grading and excavation <br /> operations The results of the inspections and the as-built conditions of the project shall be <br /> certified in writing by the geotechnical consultant for conformance to the approved plans <br /> and geotechnical report and submitted to the City Engineer for review and approval prior to <br /> occupancy <br /> PUD-110, Irby Ranch City Council <br /> Page 20 of 31 <br />