Construction activities (including other land-disturbing activities) that disturb one acre or more <br /> (including smaller sites that are part of a larger common plan of development) are regulated <br /> under the NPDES stormwater program Operators of regulated construction sites are required to <br /> develop and implement a Stormwater Pollution Prevention Plan and to obtain a Construction <br /> General Permit (NOI) from the State Water Resources Control Board to discharge stormwater <br /> httlp://www.waterboards.ca.govlwater ussJes/p rograms/stormwatetIdocs/tinaOcorustpermut <br /> .pdf <br /> Stormwater <br /> 1 The project developer shall submit a Stormwater Pollution Prevention Plan (SWPP) for <br /> review by the City Engineer/Chief Building Official prior to issuance of building or <br /> engineering permits A reviewed copy of the SWPPP shall be available at the project site <br /> until engineering and building permits have been signed off by the inspection <br /> departments and all work is complete A site specific SWPPP must be combined with <br /> proper and timely installation of the BMPs, thorough and frequent inspections, <br /> maintenance, and documentation Failure to comply with the reviewed construction <br /> SWPPP may result in the issuance of correction notices, citations or stop work orders <br /> 2 The amendments to the SWPPP and all the inspection forms shall be completed and <br /> available at the site for inspection by the city, county or state staff <br /> 3 The project developer is responsible for implementing the following Best Management <br /> Practices (BMPs) These, as well as any other applicable measure, shall be included in <br /> the SWPPP and implemented as approved by the City <br /> a The project developer shall include erosion control/stormwater quality measures on <br /> the final grading plan which shall specifically address measures to prevent soil, dirt, <br /> and debris from entering the storm drain system Such measures may include, but <br /> are not limited to, hydroseeding, hay bales, sandbags, and siltation fences and are <br /> subject to the review and approval of the City Engineer/Chief Building Official If no <br /> grading plan is required, necessary erosion control/stormwater quality measures shall <br /> be shown on the site plan submitted for an on-site permit, subject to the review and <br /> approval of the Building and Safety Division The project developer is responsible for <br /> ensuring that the contractor is aware of and implements such measures <br /> b All cut and fill slopes shall be revegetated and stabilized after completion of grading, <br /> but in no case later than October 15 Hydroseeding shall be accomplished before <br /> September 15 and irrigated with a temporary irrigation system to ensure that the <br /> grasses are established before October 15 No grading shall occur between October <br /> 15 and April 15 unless approved erosion control/stormwater quality measures are in <br /> place, subject to the approval of City Engineer/Chief Building Official Such measures <br /> shall be maintained until such time as permanent landscaping is place <br /> c Gather all sorted construction debris on a regular basis, place it in the appropriate <br /> container for recycling, and empty at least on a weekly basis When appropriate, use <br /> PUD-110, Irby Ranch City Council <br /> Page 29 of 31 <br />