Laserfiche WebLink
• <br /> tarps on the ground to collect fallen debris or splatters that could contribute to <br /> stormwater runoff pollution <br /> d Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br /> and storm drains adjoining the site Limit construction access routes onto the site and <br /> place gravel on them Do not drive vehicles and equipment off paved or graveled <br /> areas during wet weather Broom sweep the street pavement adjoining the project <br /> site on a daily basis Scrape caked-on mud and dirt from these areas before <br /> sweeping <br /> e Install filter materials (such as sandbags, filter fabric, etc ) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or dirt <br /> flowing in the storm drain system Maintain and/or replace filter materials to ensure <br /> effectiveness and to prevent street flooding <br /> f Create a contained and covered area on the site for the storage of cement, paints, <br /> oils, fertilizers, pesticides, or other materials used on the site that have the potential of <br /> being discharged into the storm drain system through being windblown or in the event <br /> of a material spill <br /> g Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br /> gutter, or storm drain <br /> h Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br /> discharge wash water into street, gutters, or storm drains <br /> i Equipment fueling area Use off-site fueling stations as much as possible Where on- <br /> site fueling occurs, use designated areas away from the storm drainage facility, use <br /> secondary containment and spill rags when fueling, discourage "topping off' of fuel <br /> tanks, place a stockpile of absorbent material where it will be readily accessible, and <br /> check vehicles and equipment regularly for leaking oils and fuels Dispose rags and <br /> absorbent materials promptly and properly <br /> j Concrete wash area Locate wash out areas away from the storm drains and open <br /> ditches, construct a temporary pit large enough to store the liquid and solid waste, <br /> clean pit by allowing concrete to set, breaking up the concrete, then recycling or <br /> disposing of properly <br /> k Equipment and vehicle maintenance area Use off-site repair shop as much as <br /> possible For on-site maintenance, use designated areas away from the storm <br /> drainage facility Always use secondary containment and keep stockpile of cleanup <br /> materials nearby Regularly inspect vehicles and equipment for leaks and repair <br /> quickly or remove from the project site Train employees on spill cleanup procedures <br /> C. Operation Requirements <br /> The Permit's operation and maintenance requirements include but are not limited to the <br /> following The operation and maintenance of treatment measures including but not limited to <br /> PUD-110, Irby Ranch City Council <br /> Page 30 of 31 <br />