Laserfiche WebLink
rights and remedies of the association, but not the obligation, to enforce the <br /> maintenance responsibilities of the property owners association <br /> 15 Prior to approval of the final map, the applicant shall comply with all applicable <br /> conditions of outside agencies having jurisdiction <br /> 16 The in-lieu park dedication fees shall be paid to the City prior to approval of the <br /> map, at the rate then in effect, for the total number of buildable lots on the map, <br /> unless otherwise provided in the development agreement for the project <br /> 17 Prior to the first plan check, the applicant's engineer/surveyor shall submit a <br /> preliminary copy of the final map along with a preliminary copy of the title report <br /> and a copy of the adjoining deeds and/or recorded maps to the City The City will <br /> forward these documents to its consultant who will estimate the cost for examining <br /> the map and certifying that the map is technically correct and in accordance with <br /> Section 66442 of the California Subdivision Map Act After the consultant has <br /> provided a cost estimate, the applicant's engineer/surveyor may submit the first <br /> plan check along with a deposit for these costs along with all other standard plan <br /> check fees Any unused portion of the estimate will be returned to the applicant <br /> after the map is recorded Similarly, if the applicant withdraws their application in <br /> writing prior to the consultant having performed the work, any unused portion of the <br /> deposit will be returned to the applicant Conversely, should consultant's estimate <br /> be insufficient to cover all of the consultant's time, the applicant will be required to <br /> pay the City the difference between the estimate and the actual cost prior to <br /> submittal of the map for the City Engineer's approval <br /> 18 At the time applicant submits the fee for the consultant map review, the applicant <br /> shall also submit the following information to the City Engineer for review and <br /> approval <br /> a) Five prints of the final map <br /> b) One copy of the preliminary title report <br /> c) One set of the computer closures <br /> d) One legible copy of the latest recorded deed for the property being subdivided <br /> e) One legible copy of the recorded deeds for each of the adjacent properties <br /> unless those properties are part of a recorded map which has been recorded <br /> within the last seven years, and <br /> f) One legible copy of the Recorded Final map, Parcel Map, or Record of Survey <br /> used to prepare this Parcel Map <br /> 19 The applicant's title company shall record the final map, CC&Rs, Storm Water <br /> Operations and Maintenance Agreement, any grant deeds or easements, and any <br /> other required documents concurrently with the Alameda County Recorder's Office <br /> 20 When the map is submitted for the City Engineer's signature, the applicant shall <br /> provide the City project engineer with <br /> i) An electronic copy of the Final Map in AutoCAD 2010 version In <br /> addition to the information shown on the parcel map, the electronic <br /> information submitted should include <br /> a) Street address(es) centered on lot(s) <br />