My WebLink
|
Help
|
About
|
Sign Out
12a
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
020717
>
12a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2017 10:33:40 AM
Creation date
2/1/2017 10:58:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2017
DESTRUCT DATE
15Y
DOCUMENT NO
12a
Document Relationships
12a ATTACHMENT 08
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
12a ATTACHMENT 08 TREE REPORT
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
12a ATTACHMENT 09
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
12a ATTACHMENT 09 FIRST CARBON SOLUTIONS
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
12a ATTACHMENT 10
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 An easement for public access to the trail, consistent with PUD-110 development <br /> plan, shall be dedicated on the face of the final map for Parcels H and K The trail, <br /> with public access, and the remainder of Parcels H and K, including the arroyo, <br /> landscaping, irrigation, and fencing, shall be maintained by the homeowners <br /> association <br /> STANDARD CONDITIONS OF APPROVAL <br /> Planning Division <br /> 9 Vesting Tentative Map 8245 shall be in substantial conformance to Exhibit B, dated <br /> "Received January 23, 2017," on file with the Planning Division, except as modified <br /> by these conditions or subject to modification if the zoning amendments adopted <br /> by the City Council differ from what was approved by the Planning Commission <br /> Minor changes to the plans may be allowed subject to the approval of the Director <br /> of Community Development <br /> 10 Planning Division approval is required before any changes are implemented in the <br /> design, grading, drainage, etc of the subdivision map <br /> 11 To the extent permitted by law, the project developer shall defend (with counsel <br /> reasonably acceptable to the City), indemnify, and hold harmless the City, its City <br /> Council, its officers, boards, commissions, employees, and agents from and <br /> against any claim (including claims for attorney fees), action, or proceeding brought <br /> by a third party against the indemnified parties and the project developer to attack, <br /> set aside, or void the approval of the project or any permit authorized hereby for <br /> the project, including (without limitation) reimbursing the City its attorney fees and <br /> costs incurred in defense of the litigation The City may, in its sole discretion, elect <br /> to defend any such action with attorneys of its choice <br /> Engineering Department <br /> 12 A "Conditions of Approval" checklist shall be completed and attached to all plan <br /> checks submitted for approval indicating that all conditions have been satisfied <br /> 13 The applicant shall grant an easement to the City over those parcels needed for <br /> public service easements (P S E ) and which are approved by the City Engineer, or <br /> other easements, which may be designated by the City Engineer <br /> 14 A final map shall be required to subdivide the property into 87 lots, Parcel A-K, and <br /> private streets / courts A-L With the map, the project applicant shall set forth the <br /> maintenance areas of the proposed development and maintenance responsibilities <br /> The project applicant shall record CC&Rs at the time of recordation of the map <br /> which shall create a Homeowners Association for the development The CC&Rs <br /> shall be subject to the review and approval of the City Attorney prior to recordation <br /> of the map The association shall be responsible for the maintenance of all <br /> common utilities and stormwater treatment measures/areas, the trail (with public <br /> access) along the south side of Nevada Street, the portion of the arroyo that is <br /> located within the project site, private streets, parking, landscaping and irrigation <br /> including landscaping within the public right-of-way The City shall be granted the <br />
The URL can be used to link to this page
Your browser does not support the video tag.