Project 1 Happy Valley Road <br />PROJECT DESCRIPTION <br />ID..................... ............................... <br />1 <br />Location .......... ............................... <br />Happy Valley Road <br />Lion .................. ............................... <br />Install approximately 3,800 feet of new 8 inch PVC pipe <br />0 ....................... ............................... <br />1 <br />ed Capital Improvement Cost..... <br />$1,489,000 <br />nts ................... ............................... <br />(1) Pipes are listed in order from upstream to downstream <br />350 <br />(II) Locations of future manholes (and associated pipe segment lengths) are approximate <br />9 <br />(III) Project Is deep due to connection at SC7D3Z103_8 (see Project 3) <br />itions ................ ............................... <br />(1) Cost estimates are based on March 2016 ENR CCI of 11178 <br />SC7D3Z103 11 <br />Iii) normal open cut construction techniques can be used (no blasting or dewatering) <br />PROJECT COST DETAIL <br />Total Baseline Pipe Construction Cost $ 827,853 <br />Baseline Construction Cost: $ 827,853 <br />Traffic Control (S %of pipe construction cost) $ 38,576 <br />Subtotal: $ 866,430 <br />Mobilization /Demobilization(10 %of subtotal) S 86,643 <br />Estimated Corstruction Cost Subtotal: $ 953,073 <br />Engineering, Administration, Legal (25% of construction cost) $ 238,268 <br />Capital Cost Subtotal $ 1,191,341 <br />rtimated Capital Improvement Co! st: $ 1,489,000 <br />Sa iarProledCotl6.xlax, 6C703Z103 51912016 <br />meter <br />Length <br />wood <br />Slope <br />Vill <br />Pipe Depth <br />Multi <br />Construction <br />- Aud" <br />Unit Cost <br />AM <br />Total Goat, <br />SC703Z103 12 <br />SC7D3Z103 11 <br />8 <br />350 <br />0.28 <br />9 <br />_. <br />Open Cut <br />$166 <br />$ 58,100 <br />SC7D3Z103 11 <br />SC7D3Z303_10 <br />8 <br />339 <br />0.84 <br />8 <br />Open Cut <br />$166 <br />$ 56,324 <br />SC7D3Z103_10 <br />SC7D3Z103_9 <br />8 <br />331 <br />0.10 <br />6 <br />Open Cut <br />$166 <br />$ 54,963 <br />SC7D3Z103_9 <br />5C7D3Z1O3_8 <br />8 <br />306 <br />0.39 <br />12 <br />Open Cut <br />$166 <br />$ 50,862 <br />SC7D3Z103_8 <br />SC7D3Z103_7 <br />8 <br />225 <br />0.26 <br />23 <br />Open Cut <br />$400 <br />$ 89,960 <br />SC7D3Z103 7 <br />SC7D3Z103 6 <br />8 <br />282 <br />0.003 <br />26 <br />Open Cut <br />$400 <br />5 112,960 <br />SC7D3Z103_6 <br />SC7D3Z103_5 <br />8 <br />295 <br />0.08 <br />22 <br />Open Cut <br />$400 <br />$ 117,880 <br />SC7D3Z103_5 <br />SUDUID3 4 <br />8 <br />289 <br />0.41 <br />16 <br />Open Cut <br />$196 <br />$ 56,546 <br />SUD32303 4 <br />SC7D3Z103_3 <br />8 <br />347 <br />0.24 <br />10 <br />Open Cut <br />$166 <br />$ 57,569 <br />SC7D3Z103 3 <br />SC7D3Z103_2 <br />8 <br />348 <br />0.21 <br />7 <br />Open Cut <br />$166 <br />$ 57,685 <br />SC7D3Z103_2 <br />SC7D3Z103_1 <br />8 <br />344 <br />0.34 <br />6 <br />Open Cut <br />$166 <br />$ 57,021 <br />SC7D3Z103 1 <br />SC7D3Z103 <br />8 <br />349 <br />0.15 <br />6 <br />Open Cut <br />$166 <br />$ 57,984 <br />Total Baseline Pipe Construction Cost $ 827,853 <br />Baseline Construction Cost: $ 827,853 <br />Traffic Control (S %of pipe construction cost) $ 38,576 <br />Subtotal: $ 866,430 <br />Mobilization /Demobilization(10 %of subtotal) S 86,643 <br />Estimated Corstruction Cost Subtotal: $ 953,073 <br />Engineering, Administration, Legal (25% of construction cost) $ 238,268 <br />Capital Cost Subtotal $ 1,191,341 <br />rtimated Capital Improvement Co! st: $ 1,489,000 <br />Sa iarProledCotl6.xlax, 6C703Z103 51912016 <br />