Laserfiche WebLink
Project 2 Happy Valley Road at Ostrich Feather Lane <br />ID..................... ............................... <br />2 <br />Location .......... ............................... <br />Happy Valley Road at Ostrich Feather Lane <br />tion .................. ............................... <br />Install approximately 800 feet of new 8 Inch PVC pipe <br />u....................... ............................... <br />1 <br />ed Capital Improvement Cost ..... <br />$250,000 <br />nts ................... ............................... <br />(i) Pipes are listed in order from upstream to downstream <br />(feet) <br />Iii) Locations of future manholes (and associated pipe segment lengths) are approximate <br />,tions...... _ .................... <br />(i) Cost estimates are based on March 2016 ENR CCI of 11178 <br />($ /LF) <br />Iii) normal open cut construction techniques can be used (no blasting required) <br />PROJECT COST DETAIL <br />Total Baseline Pipe Construction Cost $ 138,461 <br />Baseline Construction Cost: $ 138,461 <br />Traffic Control (5% of pipe construction cost) $ 6,923 <br />Subtotal: $ 145,384 <br />Mobilization/Demobilization (10% of subtotal) S 14,538 <br />Estimated Construction Cost Subtotal: $ 159,922 <br />Engineering, Administration, Legal (25% of construction cost) S 39,980 <br />Capital Cost Subtotal $ 199,902 <br />Estimated Capital Improvement Cost: $ 250,000 <br />SewerProlecCaslexlsx. SUDW101 51912015 <br />length <br />Slope <br />- "11IpEUp" - <br />Cbralliveam <br />Unit Cost <br />Tob" _ <br />(inches) <br />(feet) <br />( %) <br />(feet BGL) <br />Method <br />($ /LF) <br />($) <br />7SUDW101 <br />7D3M101 3 <br />8 <br />239 <br />0.19 <br />7 <br />Open Cut <br />$166 <br />$ 39,591 <br />7D3M301_2 <br />8 <br />343 <br />0.39 <br />J <br />Open Cut <br />$166 <br />$ 56,971 <br />JD3M301_3 <br />8 <br />142 <br />0.31 <br />7 <br />Open Cut <br />$166 <br />$ 23,489 <br />CJD3M101 <br />8 <br />111 <br />0.11 <br />7 <br />Open Cut <br />$166 <br />$ 18,4 09 <br />Total Baseline Pipe Construction Cost $ 138,461 <br />Baseline Construction Cost: $ 138,461 <br />Traffic Control (5% of pipe construction cost) $ 6,923 <br />Subtotal: $ 145,384 <br />Mobilization/Demobilization (10% of subtotal) S 14,538 <br />Estimated Construction Cost Subtotal: $ 159,922 <br />Engineering, Administration, Legal (25% of construction cost) S 39,980 <br />Capital Cost Subtotal $ 199,902 <br />Estimated Capital Improvement Cost: $ 250,000 <br />SewerProlecCaslexlsx. SUDW101 51912015 <br />