My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
022117
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:59:53 PM
Creation date
2/16/2017 12:03:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2017
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 3 Happy Valley Road about 1,400 feet east of Larson lane. <br />PROJECT DESCRIPTION <br />ID..................... ............................... 3 <br />Location .......... ............................... Happy Valley Road about 1,400 feet east of Larson Lane. <br />I ................. . .........I ... .... ........ ...... Install approximately 500 feet of new 8 inch PVC pipe <br />.................... ............................... 2 <br />Capital Improvement Cost ..... $164,000 <br />....__......._ _ <br />....................... (1) Pipes are listed in order from upstream to downstream <br />(ii) Locations of future manholes (and associated pipe segment lengths) are approximate <br />(III) Project serves potential future units in parcel APN 949000701304 <br />(iv) Deep connection due to creek between SC7D3Z303_7A and SC7D3Z303_7 <br />(v) The vertical location of this project Is driven by the elevation of the flowline in an unnam <br />creek north of Happy Valley Road. During the predesign stage, the flowline of the creek shoe <br />be surveyed. The results of the survey may alter the proposed elevations of this project and <br />SC703Z103_8D SC703ZI03_SC <br />SC7D3Z103_8C SC7D3Z303_88 <br />SC7D3Z103_8B SC7D3Z103_8_creek <br />.703Z303 8 tree SC7D3Z103 8A <br />Project 1. <br />(ii) Cost estimates are based on February 2015 ENR CCI of 11178 <br />(ii) Open cut construction assumed across creek <br />PROJECT COST DETAIL <br />57 <br />65 <br />44 <br />46 <br />283 <br />0.29 6 Open Cut 5166 5 <br />0.31 8 Open Cut $166 $ <br />0.003 7 Open Cut $166 $ <br />0.003 5 Open Cut $166 5 <br />0.003 13 Open Cut $196 5 <br />9,379 <br />10,790 <br />7,238 <br />7,702 <br />55,527 <br />Total Baseline Pipe Construction Cost $ <br />90,636 <br />Baseline Construction Cost: $ <br />90,636 <br />Traffic Control (5% of pipe construction cost) $ <br />4,532 <br />Subtotal: $ <br />9S,168 <br />Mobilization /Demobilization(30% of subtotal) $ <br />10,000 <br />Estimated Construction Cost Subtotal: $ <br />105,168 <br />Engineering, <br />Administration, Legal (25% of construction cost) $ <br />26,292 <br />Capital Cost Subtotal $ <br />131,459 <br />Project Contingency (20 %) $ <br />32,865 <br />4,000 <br />SewerpmoctcomAlax, SC70an S 5ro 016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.