My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
022117
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:59:53 PM
Creation date
2/16/2017 12:03:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2017
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 5 Laura Lane and E. Mockingbird Ln. <br />PROJECT DESCRIPTION <br />ID..................... ............................... <br />5 <br />Location .......... ............................... <br />Laura Lane and E. Mockingbird Ln. <br />tion .................. ............................... <br />Install approximately 1,300 feet of new 8 inch PVC pipe <br />D....................... ............................... <br />1 <br />ed Capital Improvement Cost ..... <br />$669,000 <br />nts ................... ............................... <br />(i) Pipes are listed In order from upstream to downstream <br />(feet) <br />(ii) Locations of future manholes (and associated pipe segment lengths) are approximate <br />itlons ................ ............................... <br />(i) Cost estimates are based on March 2016 ENR CC] of 11178 <br />($ /LF) <br />(ii) normal open cut construction techniques can be used (no blasting or dewatering) <br />D/S <br />Length <br />Slope <br />PIpeII6pi11i <br />Construction <br />'OWCost <br />Total` <br />MH ID ' <br />-.) <br />(feet) <br />( %) <br />(feet BGL) <br />Method <br />($ /LF) <br />($) <br />SD7C1M301_5 <br />S07C1M301_ 4 <br />8 <br />286 <br />0.29 <br />7 <br />Open Cut <br />$166 <br />$ 47,393 <br />SD7CIM301_4 <br />SD7C1M301 3 <br />8 <br />210 <br />0.02 <br />7 <br />Open Cut <br />$166 <br />$ 34,827 <br />SD7C1M301_3 <br />SD7C1M301_2 <br />8 <br />333 <br />0.29 <br />6 <br />Open Cut <br />$166 <br />$ 55,195 <br />SD7C1M3012 <br />SD7C1M3011 <br />8 <br />251 <br />0.17 <br />7 <br />Open Cut <br />$166 <br />$ 41,633 <br />Total Baseline Pipe Construction Cost $ 214,007 <br />Baseline Construction Cost: $ 214,007 <br />Traffic Control (5% of pipe construction cost) $ 10,700 <br />Subtotal: $ 224,708 <br />Mobilization /Demobilization(10 %ofsubtotal) $ 22,471 <br />Estimated Construction Cost Subtotal: $ 428,014 <br />Engineering, Administration, Legal (25% of construction cost) $ 107,004 <br />Capital Cost Subtotal $ 535,018 <br />s <br />Estimated Capital Improvement Cost: $ 669,000 <br />6emvPm,WCostx xlax. 507612300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.